Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 301-310 of 1192 of 1192
A47 Wansford to Sutton resurfacing
We're resurfacing works on the A47 between Wansford and Sutton. Start date 28 July 2025 End date September 2025 Cost 1.3 million Latest updates Overview Documents Latest updates 15 July 2025 Work to begin in July We're resurfacing works on the A47 between Wansford and Sutton. We’ll begin
…
https://nationalhighways.co.uk/our-roads/east/a47-wansford-to-sutton-resurfacing/
A27 Arundel bypass (cancelled)
Following the Chancellor of the Exchequer’s announcement to the House of Parliament on 29 July 2024, the A27 Arundel Bypass will not be taken forward. Start date Cancelled End date N/A Cost N/A Latest updates Overview Documents Latest updates 16 January 2025 Withdrawal of notification of de
…
https://nationalhighways.co.uk/our-roads/south-east/a27-arundel-bypass/
M27 between Ower and Rownhams interchanges
Joint and waterproofing replacement on top of the bridge and concrete repairs underneath to maintain structural integrity. Start date 7 July 2025 End date December 2025 Cost TBC Latest updates Overview Documents Latest updates 17 July 2025 Overnight closures There are overnight closures co
…
https://nationalhighways.co.uk/our-roads/south-east/m27-between-ower-and-rownhams-interchanges/
A1 Scotswood to North Brunton
We’re increasing the current two lanes of the A1 in each direction to three lanes between Scotswood and North Brunton. Start date March 2020 End date November 2022 Cost £100 million to £120 million Latest updates Overview Documents Latest updates 14 November 2022 Minister celebrates success
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a1-scotswood-to-north-brunton/
Communities
We'll support community wellbeing by tackling local environmental impacts and increasing climate resilience. In this section Our purpose as an organisation is to connect people and places. This doesn't stop with roads. It's our responsibility to do what we can to connect communities with amenitie
…
https://nationalhighways.co.uk/our-work/environment/communities/
Carbon
We will deliver net zero corporate emissions by 2030, maintenance and construction emissions by 2040 and road user emissions by 2050 Publicly Available Specification (PAS) 2080 accreditation Our management system to reduce carbon during the design, construction, and operation of England’s strategi
…
https://nationalhighways.co.uk/our-work/environment/carbon/
Early careers
There are a variety of early career opportunities on the A428 We have many opportunities for local people to kick-start their careers via apprenticeships, work placements and graduate programmes. These will be in a wide range of disciplines from site-based roles such as steel fixers and operatives
…
https://nationalhighways.co.uk/our-roads/a428-black-cat-to-caxton-gibbet/jobs-skills-education-and-supply-chain/early-careers/
The Carbon Academy
To explore low-carbon innovation and to put green skills at the forefront of the UK’s construction industry, we’re going back to the classroom In this section The infrastructure and construction industries must continue to innovate and adapt to net zero. Our Carbon Academy will work with industry
…
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/jobs-skills-and-education/carbon-academy/
A303 Stonehenge
Our archaeological investigations so far have included a range of detailed surveys of areas of land that will be disturbed by construction both inside and outside the World Heritage Site. Almost two square miles of “geophysical” surveys along the entire length of the scheme and ground penetrating r
…
https://nationalhighways.co.uk/our-work/archaeology/a303-stonehenge/
What’s next
In this section On Thursday 7 March 2024, the Secretary of State for Transport approved the Development Consent Order (DCO) for the A66 Northern Trans-Pennine project. This means we now have planning permission to dual 18 miles of single carriageway between Penrith and Scotch Corner. We are
…
https://nationalhighways.co.uk/our-roads/a66-northern-trans-pennine/what-s-next/
First
Previous
Page
26
Page
27
Page
28
Page
29
Page
30
Page
31
Page
32
Page
33
Page
34
Page
35
Next
Last