Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 71-80 of 445 of 445
Cobham Road bridge repairs over M25 - National Highways
…
We're maintaining the bridge carrying Cobham Road over the
M
25 between Cobham and Leatherhead in Surrey. We’ll need to close the bridge over two weekends in 2025 while we work.
…
…
Diversion When the Cobham Road bridge is closed, directly above the
M
25, there will be fully signed di
…
https://nationalhighways.co.uk/our-roads/south-east/cobham-road-bridge-repairs-over-m25/
M60 junction 18 Simister Island Interchange - National Highways
…
And overnight from Monday 24 February through to Friday 7 March 2025 from 8:00am to
6
:00pm. Temporary traffic management will be in place to ensure the safety of our contractors while the work is carried out.
…
…
and
M
66 Consultations
M
60/
M
62/
M
66 Simister Island Interchange supplementary consultation July 2023 - map book 1 - general arrangements
M
…
https://nationalhighways.co.uk/our-roads/north-west/m60-junction-18-simister-island-interchange/
A61 Westwood roundabout - National Highways
…
Improvements at Westwood roundabout (A61/A616) at Tankersley and technology improvements along the A628 Woodhead Pass Start date March 2020 End date 2023 Cost £18.
6
million Latest updates Overview Documents Related road projects Latest updates 22 June 2022 Technology upgrade We are in the
…
…
This scheme is part of a wider package of work that will improve the existing route conn
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a61-westwood-roundabout/
Office access and opening times - National Highways
…
Bristol Temple Point Redcliffe Way Redcliff Bristol BS1
6
NL Parking: no car parking available. Disabled access: level access to front and rear entrance. Exeter Ash House Falcon Road Sowton Industrial Estate Exeter EX2 7LB Parking: no car parking available.
…
…
Manchester Piccadilly Gate Store Street Manchester
M
1
…
https://nationalhighways.co.uk/about-us/office-access-and-opening-times/
A3 Guildford air quality - National Highways
…
We are hosting public information events on Tuesday 4 and Thursday
6
March for people to find out more about the proposed changes: All Saints Church, Vicarage Gate, Guildford, GU2 7QJ Tuesday 4 March, 2pm - 7:30 pm Thursday
6
March 2pm- 7:30pm More information, including maps of the proposed alternative
…
…
This is part of a wider piece of work National Highways is doing to
…
https://nationalhighways.co.uk/our-roads/south-east/a3-guildford-air-quality/
Emergency area width review - National Highways
…
The current standard width is 15 foot (4.
6
metres). Design standards before 2015 permitted emergency area widths to be 13 foot (4 metres) where necessary. A conventional hard shoulder is 11 foot (3.3 metres) wide.
…
…
Two emergency areas on all lane running sections – on the
M
1 and
M
25
…
https://nationalhighways.co.uk/our-work/smart-motorways-evidence-stocktake/emergency-area-width-review/
Commuted Lump Sum A Guide for Promoters of Major Third Party Projects 28 No
…
D1.3 Gully Emptying, including clearing aprons, covers and obstructions 2 100 n/a no. £
10.00
£3.00 £13.00 14,300 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
50 £
6
5
…
https://nationalhighways.co.uk/media/iwpjkyfv/cls-guidance-for-promoters-of-major-third-party-projects-2024-endorsed.pdf
A19 Testo’s junction - National Highways
…
The £130
m
Testo’s junction upgrade brings great benefits to the North East, providing swifter, more reliable free-flowing journeys and supporting economic growth in the region.
…
…
The objectives of this scheme are to: support economic growth provide a safe and serviceable road network provide a more free-flowing road network improve the environment provide an accessible and integrated
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a19-testo-s-junction/
South East LED roadside lighting upgrades - National Highways
…
Latest updates Overview Documents The south east of England will benefit from a £132
m
nationwide project switching 70% of lights on the Strategic Road Network (SRN) to cleaner LED alternatives by 2027. This involves replacing over 50,000 lights across the country.
…
…
All closures are between 8pm and
6
am
…
https://nationalhighways.co.uk/our-roads/south-east/south-east-led-roadside-lighting-upgrades/
Project profile: Great Musgrave Bridge - National Highways
…
The Eden Viaduct was an impressive 221ft (67
m
) long with three spans of iron and reached 20ft (
6m
) above the river at its highest point. The EVR line eventually became Eden Valley Junction, which connected to the former Lancaster and Carlisle Railway.
…
…
4 of
6
Enlarge Great Musgrave Bridge and new embankment after infill work complete 5 of
6
…
https://nationalhighways.co.uk/our-work/historical-railways-estate/project-profiles/great-musgrave-bridge/
First
Previous
Page
3
Page
4
Page
5
Page
6
Page
7
Page
8
Page
9
Page
10
Page
11
Page
12
Next
Last