Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 281-290 of 804 of 804
QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVI...
QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVISION BETWEEN: NATIONAL HIGHWAYS LIMITED Claimant - and - (1) PERSONS UNKNOWN CAUSING THE BLOCKING OF, ENDANGERING, OR PREVENTING THE FREE FLOW OF TRAFFIC ON THE M25 MOTORWAY, A2 A20 AND A2070 TRUNK ROADS AND M2 AND M20 MOTORWAY, A1(M), A3, A12, A13, A21, A23, A30, A414 AND A3113 TRUNK ROADS AND THE M1, M3, M4, M4 SPUR, M11, M26, M23 AND M40 MOTORWAYS FOR THE PURPOSE OF PROTESTING (2) MR ALEXANDER RODGER AND 138 OTHER
…
https://nationalhighways.co.uk/media/le5ncp3o/nhl-review-hearing-final-skeleton.pdf
Key Requirements for Third Party Nationally Significant Infrastructure Projects ...
Key Requirements for Third Party Nationally Significant Infrastructure Projects Key Requirements and Guidance for Promoters 30 April 2025 1. Introduction National Highways has a set of key requirements for Third Party Nationally Significant Infrastructure Projects (NSIPs), i.e., NSIPs promoted by an organisation other than National Highways. These requirements are needed to enable National Highways to fulfil its responsibilities to provide a safe, serviceable and effective network. If these requ
…
https://nationalhighways.co.uk/media/sp4n5qbo/key-requirements-for-third-party-nsips-guidance-for-promoters-for-website.pdf
Manual Guidance. Other aligned, minor changes, at 7.2, 7.4.7, 7.7 and 7.15.1. (I...
Manual Guidance. Other aligned, minor changes, at 7.2, 7.4.7, 7.7 and 7.15.1. (Issue 197) • E-mail for CCTV Services Team corrected within Use of non-standard CCTV chapter at 7.19.6. (Issue 190) • Errors corrected within Service Provider Contingency Plan Model Document at Annex 7.8.12. Formatting changes made to improve readability and some minor paragraph numbering issues. (Issue 194) • Amendments made to Chapter 7.17 to include cross-reference to Managing and Identifying Canine Fatalities Form
…
https://nationalhighways.co.uk/media/wcxn5b15/nmm_changes.pdf
Vision for route strategies Planning for the future of our roads highwaysengland...
Vision for route strategies Planning for the future of our roads highwaysengland.co.uk 2 Introduction Our aspiration for our next round of route strategies is to build upon the work we have done previously, to set out: The roads managed by Highways England play A planned set of future requirements for the a critical role in enabling businesses to transport products and services, providing access to network that is responsive to environmental jobs and suppliers, and facilitating trade and needs;
…
https://nationalhighways.co.uk/media/stwo3xvx/vision-for-route-strategies.pdf
North West maintenance schemes - National Highways
Maintenance schemes taking place in the North West region. Overview Documents The latest maintenance schemes that will be running in this area can be found below in the 'Project information area'. Project information View a maintenance scheme You can view more details about the maintenance schemes taking place in the North West below: A590 Newby Bridge to Barrow Banks resurfacing and vegetation works - 11 September to November 2025 We'll close the A590 between Newby Bridge Roundabout and
…
https://nationalhighways.co.uk/our-roads/north-west/north-west-maintenance-schemes/
c:\users\gwilkie\the martin group\tm operating centre - c2667 - area 4\c2667-b- ...
c:\users\gwilkie\the martin group\tm operating centre - c2667 - area 4\c2667-b- 2024 - 2025\c2667-b-52 a27 blakehurst lane to clapham\10 design\cad files\a27 blakehurst lane to clapham.dwg New Road - A284 HW Martin Traffic Management Client: Contractor: Project Title: Drawing Title: Drawn by: Greg W Date: 09/06/2025 Drawing No: Fordbridge Lane Checked by: Paul D Date: Blackwell 09/06/2025 HWM(TM)C2667-B-52-10-C Derbyshire Approved by: PC Date: TBC DE55 5JY Status: Tel: 01773 813213 A27 Blakehurs
…
https://nationalhighways.co.uk/media/qdidx430/a27-eastbound-crossbush-to-clapham-diversion-map.pdf
Marks Farm Roundabout to Marks Tey Resident access Goseld Halstead Earls Colne ...
Marks Farm Roundabout to Marks Tey Resident access Gos eld Halstead Earls Colne Chappel Braintree 1 3 A120 2 A120 4 Marks Tey Copford Bradwell Coggeshall Tye Green Feering A12 Kelvedon Key 1 Property location 1 2 Property location 2 3 Property location 3 Tiptree 4 Property location 4 Witham CRE25_0235 © Crown copyright and database rights 2025 OS AC0000827444 - Diagrammatic plan - Not to scale
https://nationalhighways.co.uk/media/ur4aho0t/a120-speed-restrictions-phased-zones-and-access_v1.pdf
Lean Tracker User Guide 24th March 2025 Version 1.2 © 2022 National Highways Doc...
Lean Tracker User Guide 24th March 2025 Version 1.2 © 2022 National Highways Document Control Document Title Lean Tracker User Guide Author Lean Team Owner Martin Bolt Distribution Lean Tracker Users (Internal & External) Document Status Final Revision History VERSION DATE Description AUTHOR 11 December 2023 First draft Chantelle Faint 3 June 2024 Second draft Chantelle Faint 24 March 2025 Update Chantelle Faint Approvals Title / Name DATE OF ISSUE VERSION Responsibility Martin Bolt Head of Lean
…
https://nationalhighways.co.uk/media/so4nnyvu/lean-tracker-user-guide.pdf
Planning for the future A guide to working with National Highways on planning ma...
Planning for the future A guide to working with National Highways on planning matters October 2023 Contents Introduction . 1 Our role in planning .6 Our approach to planning .8 Key assessment considerations on planning matters .10 Engagement with plan-making .14 Engagement with decision-taking .18 Other statutory engagement .24 Funding .25 Key contacts .27 Acronyms .27 ii Introduction 1. This document, our planning guide1, describes 3. This guide is written in the context of statutory the approa
…
https://nationalhighways.co.uk/media/imvluu5w/final-cre23_0370-nh-planning-guide-2023.pdf
A19 / A1058 Coast Road junction improvement Three-year post-opening project eval...
A19 / A1058 Coast Road junction improvement Three-year post-opening project evaluation This document has been prepared by National Highways with assistance from its consultants (where employed). The document and its accompanying data remain the property of National Highways. While all reasonable care has been taken in the preparation of this document, it cannot be guaranteed that it is free of every potential error. In the absence of formal contractual agreement to the contrary, neither National
…
https://nationalhighways.co.uk/media/opucww4y/a19-coast-road-three-year-post-opening-project-evaluation.pdf
First
Previous
Page
24
Page
25
Page
26
Page
27
Page
28
Page
29
Page
30
Page
31
Page
32
Page
33
Next
Last