Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 111-120 of 417 of 417
Traffic camera/CCTV services
We use traffic cameras to assist with the management of traffic on the motorway and trunk road network in England National Highways and traffic cameras We own almost 4000 traffic cameras which have been used to assist with the management of traffic on the trunk road and motorway network in England for nearly 30 years. Wales and Scotland have separate operations. The traffic cameras are usually
…
https://nationalhighways.co.uk/travel-updates/traffic-cameracctv-services/
A30 Chiverton to Carland Cross
Upgrading the A30 single carriageway between Chiverton Cross and Carland Cross roundabouts. As part of our Strategic Road Network, the A30 is a road of strategic importance, which is why an £8m contribution from the European Regional Development Fund has been committed, as well as being identified as part of the Government’s Roads Investment Strategy. Start date March 2020 End date 2024 Cost £
…
https://nationalhighways.co.uk/our-roads/south-west/a30-chiverton-to-carland-cross/
A47 Acle to Beccles Interchange lighting and maintenance
We’ll be resurfacing, upgrading lights and refreshing road marking on the A47 between Acle and Beccles Interchange in Gorleston-on-Sea, near Great Yarmouth. Start date 27 May 2025 End date November 2025 Cost TBC Latest updates Overview Documents Latest updates 17 July 2025 Change of diversion route - 17 to 18 July (8pm to 6am) We're changing our diversion route for the A47 Acle roundabou
…
https://nationalhighways.co.uk/our-roads/east/a47-acle-to-beccles-interchange-lighting-and-maintenance/
A47 Blofield to North Burlingham
We are upgrading the A47 between Blofield and North Burlingham to dual carriageway to ease congestion and support economic growth in the area. Start date 2023-24 End date 2026-27 Cost £90 million - £100 million Latest updates Overview Documents Related road projects Latest updates 01 August 2025 Upcoming road closures in August We’re doing significant work in the next stage of our A47 B
…
https://nationalhighways.co.uk/our-roads/east/a47-blofield-to-north-burlingham/
Safety schemes in the South West region
We're delivering targeted speed limit reductions on the A40 and A46. This is part of our ongoing commitment to reduce the number of people harmed on the region's roads. Start date Spring 2025 End date TBC Cost TBC Overview Documents What we're doing Safety is and always will be our number one priority. That's why our ambition remains that no-one should be harmed while travelling or working
…
https://nationalhighways.co.uk/our-roads/south-west/safety-schemes-in-the-south-west-region/
Safety schemes in the East region
We're delivering targeted speed management changes at six different locations in the East region, on the A47, A5 and A120. This is part of our ongoing commitment to reduce the number of people harmed on the region’s roads. Start date Spring 2025 End date Winter 2025 Cost TBC Overview Documents What we're doing Safety is and always will be our number one priority, and that is why our ambitio
…
https://nationalhighways.co.uk/our-roads/east/safety-schemes-in-the-east-region/
Smart Motorway Network All lane running motorway (ALR) 1 M1 Junction 13 - 16 12 ...
Smart Motorway Network All lane running motorway (ALR) 1 M1
Junction
13 - 16 12 M6
Junction
13 - 15 2 M1
Junction
16 - 19 13 M6
Junction
16 - 19 3 M1
Junction
24 - 25 14 M6
Junction
21a - 26 4 M1
Junction
28 - 31 15 M20
Junction
3 - 5 5 M1
Junction
3
…
https://nationalhighways.co.uk/media/51bnrunf/cre25_0085-operational-and-planned-smart-motorways-map_v1.pdf
A63 South Cave to North Ferriby safety barrier and lighting renewal
As part of our essential safety maintenance we are replacing the safety barrier and upgrading the lighting between South Cave and North Ferriby along with resurfacing the footbridge at Elloughton, to keep road users safe for years to come. Start date June 2024 End date Spring 2025 Cost TBC Latest updates Overview Documents Related road projects Latest updates 14 May 2025 Further overnigh
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a63-south-cave-to-north-ferriby-safety-barrier-and-lighting-renewal/
A120 Crown Interchange to Little Bentley roundabout concrete surface repairs and maintenance
We'll be carrying out specialist repairs and maintenance on the stretches of the concrete road surface on the A120 between Crown Interchange and Little Bentley roundabout in both directions. Start date October 2024 End date March 2025 Cost £7.2 million Latest updates Overview Documents Latest updates 14 March 2025 Work has finished We're delighted to say that we finished our work on 7 Ma
…
https://nationalhighways.co.uk/our-roads/east/a120-crown-interchange-to-little-bentley-roundabout-concrete-surface-repairs-and-maintenance/
Pre-2009 research publications archive
3/359 Editing Anglo French Publication on Bridge Management TR 3/372 Whole life CostBenefit Analysis for Median Safety Barriers A A Practical Laboratory Tool For Pavement Foundation Design A radical new approach to pavement design ABP treated salt spread rate research ABP Treated Salt Trial Accessibility Accident cluster Analysis optimisation Accumulation and Dispersal of Suspended Solids
…
https://nationalhighways.co.uk/our-work/innovation-and-research/research-and-development/pre-2009-research-publications-archive/
First
Previous
Page
7
Page
8
Page
9
Page
10
Page
11
Page
12
Page
13
Page
14
Page
15
Page
16
Next
Last