Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 101-110 of 397 of 397
M60 junction 18 Simister Island Interchange - National Highways
Proposals to create extra capacity at junction 18 to reduce congestion and support economic growth. Start date TBC End date TBC Cost TBC Latest updates Overview Documents Latest updates 10 September 2025 M60 Simister Island On 9 September 2025, the Secretary of State for Transport approved our Development Consent Order (DCO) for the M60 junction 18 Simister Island Interchange scheme. This approval grants us planning permission to move forward with work that will deliver smoother, saf
…
https://nationalhighways.co.uk/our-roads/north-west/m60-junction-18-simister-island-interchange/
M1 junction 30 to 31 emergency area retrofit northbound and southbound - National Highways
From January 2024 we are set to build an additional 10 emergency areas on the M1 between junction 30 near Barlborough in Derbyshire and junction 31 at Aston in South Yorkshire. This is in addition to the existing six. Start date January 2024 End date January 2025 Cost TBC Latest updates Overview Documents Latest updates 12 December 2024 Progress update - December 2024 We're pleased to let our customers know, that having been delayed by the storm last week, we have now removed the remai
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/m1-junction-30-to-31-emergency-area-retrofit-northbound-and-southbound/
M1 junction 32 to 35a emergency area retrofit - National Highways
From June 2023 we are set to build an additional 12 emergency areas on the M1 between junction 32 (Thurcroft) and junction 35a (Stocksbridge). This is in addition to the existing 8 emergency areas. Start date June 2023 End date Winter 2024 Cost TBC Latest updates Overview Documents Latest updates 23 October 2024 We've completed our work between junctions 34 and 35A We’ve finished ten emergency areas in this section of work, and if you drive it you'll notice we've removed a large amount
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/m1-junction-32-to-35a-emergency-area-retrofit/
M3 junction 9 improvements - National Highways
We’re proposing to change junction 9, so it has free-flowing links between the M3 and the A34 in both directions Start date 2024-25 End date Road Period 3 (2025-2030) Cost £268 million to £322 million Latest updates Overview Documents Related road projects Latest updates 24 October 2025 24-hour closure of A33 and A34 southbound to enable Kings Worthy bridge beam removal We’ve been conducting essential repairs beneath Kings Worthy Bridge, including beam strengthening and concrete remov
…
https://nationalhighways.co.uk/our-roads/south-east/m3-junction-9-improvements/
M54 to M6 link road - National Highways
This scheme will provide an improved link between the M54 and the M6. Currently, there's no direct motorway link from the M54 to the M6 north. This means high volumes of both long distance and local traffic use the local roads to travel this route. Start date TBC End date TBC Cost TBC Latest updates Overview Documents Related road projects Latest updates 29 October 2025 Roadworks update - October and November Unscheduled Roadworks at Back Moor We apologise for the disruption caused b
…
https://nationalhighways.co.uk/our-roads/west-midlands/m54-to-m6-link-road/
A47 Blofield to North Burlingham - National Highways
We are upgrading the A47 between Blofield and North Burlingham to dual carriageway to ease congestion and support economic growth in the area. Start date 2023-24 End date 2026-27 Cost £90 million - £100 million Latest updates Overview Documents Related road projects Latest updates 16 October 2025 A47 Cucumber Lane to Acle Roundabout overnight closure - 29 to 30 October 2025 On Wednesday 29 to Thursday 30 October 2025 (8pm-6am), there will be an overnight road closure on the A47 from t
…
https://nationalhighways.co.uk/our-roads/east/a47-blofield-to-north-burlingham/
A27 East of Lewes - National Highways
Creating safer and more reliable journeys between Firle and Polegate. Start date Spring 2020 End date Spring 2023 Cost £75 million Latest updates Overview Documents 1 of 4 Enlarge 2 of 4 Enlarge 3 of 4 Enlarge 4 of 4 Enlarge Close × 1 of 4 2 of 4 3 of 4 4 of 4 Latest updates 22 June 2023 Scheme complete We held a special event on Friday 16 June to celebrate the end of our scheme and talk with local people about the improvements we’ve made both on and off the road along the
…
https://nationalhighways.co.uk/our-roads/south-east/a27-east-of-lewes/
M67 St Anne’s Road bridge replacement project - National Highways
The bridge that carries St Anne’s Road over the M67 motorway needs extensive repairs. A major construction project to replace St Anne’s Road bridge in Denton is underway. Start date January 2023 End date 2026 Cost £23 million Latest updates Overview Documents Latest updates 29 October 2025 Upcoming work and closures We’ve recently waterproofed the bridge deck and completed the remaining structural works. Currently, we're surfacing the footways and will continue onto carriageway, slip
…
https://nationalhighways.co.uk/our-roads/north-west/m67-st-anne-s-road-bridge-replacement-project/
A120 Crown Interchange to Little Bentley roundabout concrete surface repairs and maintenance - National Highways
We'll be carrying out specialist repairs and maintenance on the stretches of the concrete road surface on the A120 between Crown Interchange and Little Bentley roundabout in both directions. Start date October 2024 End date March 2025 Cost £7.2 million Latest updates Overview Documents Latest updates 14 March 2025 Work has finished We're delighted to say that we finished our work on 7 March 2025, ahead of schedule. During our scheme, we: replaced 116 concrete sections laid 198 met
…
https://nationalhighways.co.uk/our-roads/east/a120-crown-interchange-to-little-bentley-roundabout-concrete-surface-repairs-and-maintenance/
M6 junction 21a to 26 motorway upgrade - National Highways
We're improving the 10-mile section of the M6 between junctions 21a and 26, by upgrading it to an all-lane running motorway. This will provide increased capacity in a cost-effective way, maximising the use of the existing road. Start date March 2021 End date Spring 2025 Cost £259 million to £285 million Latest updates Overview Documents Latest updates 21 May 2025 Last part of motorway surfacing to begin Work to resurface the remaining section of the M6 between junction 21a and 26 begin
…
https://nationalhighways.co.uk/our-roads/north-west/m6-junction-21a-to-26-motorway-upgrade/
First
Previous
Page
6
Page
7
Page
8
Page
9
Page
10
Page
11
Page
12
Page
13
Page
14
Page
15
Next
Last