Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 91-100 of 172 of 172
Net zero highways: our 2030 / 2040 / 2050 plan NET ZERO HIGHWAYS THREE STRONG CO...
…
Our green
space
removes around 15,000 tonnes of carbon from the atmosphere each year as well as providing a haven for wildlife.
…
…
Managing these verges and our other open
spaces
for both carbon lock up and biodiversity supports our commitment in our Biodiversity Plan to have no net
…
https://nationalhighways.co.uk/media/uxjpf0b1/net-zero-highways-our-2030-2040-2050-plan.pdf
Movement of abnormal indivisible loads through planned roadworks
…
These conflicts occur when the remaining road
space
is less than the width of the load or a temporary weight restriction prevents the move from proceeding.
…
…
Coordination of Network Activity Coordination is the review and management of road
space
occupancy, to ensure the minimum ro
…
https://nationalhighways.co.uk/media/zcolh4u5/movement-of-abnormal-loads-through-planned-roadworks_report-bhm22_0106.pdf
A47 Thickthorn junction near Norwich - National Highways
…
Work The reason for the closure is that the one-way stretch of Cantley Lane South is too narrow for plant and equipment to share the road
space
safely with local traffic while the work is being carried out.
…
…
Work The reason for the closure is that the one-way stretch of Cantley Lane South is too narrow for plant and equipment to share the road
space
s
…
https://nationalhighways.co.uk/our-roads/east/a47-thickthorn-junction-near-norwich/
Iconic M6 Lune Gorge bridges set for major facelift
…
The social value work has included a £10,000 donation to Bendrigg Trust in Kendal to help improve their outdoor
space
for disabled service users including customers with particularly complex needs.
…
https://nationalhighways.co.uk/iconic-m6-lune-gorge-bridges-set-for-major-facelift/
HELMA 2024 framework guide National Highways April 2024 version 1 Background The...
…
As a result of the engagement, NH will provide a template (to be released soon) for you to gather and present your evidence i n one
space
. Although this is not mandated, it is highly recommended to create consistency.
…
https://nationalhighways.co.uk/media/q1pl2l5y/helma-2024-framework-guide.pdf
Specialist Professional and Technical Services (SPATS) Framework Lot 1 & Lot 2 T...
…
However, where constraints existed (for example limited available
space
) IAN 111/08, IAN 161/12 and IAN 161/13 permitted a relaxation to reduce the width to 4.0m (13 foot).
…
…
However, where constraints existed (for example limited available
space
) IAN 111/08, IAN 161/12 and IAN 161
…
https://nationalhighways.co.uk/media/r5vadqcd/smiii-report-ea-width.pdf
Lower Thames Crossing - Walkers, cyclists and horse riders - Thurrock - National Highways
…
Stanford Road realigned A 2.4km length of Stanford Road will be realigned because of the
space
required to form slip roads. Where Stanford Road is realigned, the existing shared pedestrian-cycle track that sits alongside Stanford Road will be replaced with one meeting current standards.
…
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/environment/walkers-cyclists-and-horse-riders/walkers-cyclists-and-horse-riders-in-thurrock-brentwood-and-havering/
A12 junction 25 Marks Tey to junction 26 Stanway concrete road reconstruction - National Highways
…
A contraflow is when the road is shut in one direction and traffic is then moved over to drive on the other side of the road to share the remaining road
space
. This provides us with a clear working area, which means we can work more quickly and safely.
…
https://nationalhighways.co.uk/our-roads/east/a12-junction-25-marks-tey-to-junction-26-stanway-concrete-road-reconstruction/
Structures infilled by National Highways following the abolition of BRBR on 30th...
…
The remaining
space
in the void was filled and bat features, to support wildlife, were added to the structure. The void underneath this strucutre was almost completely filled Permitted Benton by parties NPB/719 £71,306.43 HRE development (classed 2020 Road unknown.
…
…
Long Heys Permitted Filling the SLD/6 Lane £74,918.00 HRE development (classed remaining
space
2
…
https://nationalhighways.co.uk/media/d5rcembw/structures-infilled-since-sept-2013-ab-update.pdf
Learning on the road to good design: Case studies Foreword The road to good desi...
…
The public
spaces
created are flexible in their use, offering the opportunity for large gatherings, as well as solitude in the heart of the city. Images 1.
…
…
It has provided new open
spaces
and opportunities for recreation in the heart of a dense city. Over 33,000 trees, 40km of fo
…
https://nationalhighways.co.uk/media/kjknybwj/learning-on-the-road-to-good-design_case-studies.pdf
First
Previous
Page
5
Page
6
Page
7
Page
8
Page
9
Page
10
Page
11
Page
12
Page
13
Page
14
Next
Last