16 September 2025
Overnight closures
We’ve completed the removal of the two footbridges and are ready to install the 24/7 lane one closure on the A259.
To install the 24/7 lane one closure safely we’ll need to close the A259 in both directions overnight between the hours of 8pm to 6am on:
- Wednesday 24 September for three nights
- Monday 29 September for two nights
Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England. Our travel alerts give details of live incidents on our network.
-
05 September 2025
Weekend footbridge closure rescheduled
Work to remove the footbridge this weekend has been postponed, whilst we continue to engage with local residents and businesses.
The full weekend closure to the A259 in both directions between the junctions with the A269 will now take place Friday 12 to Monday 15 September (8pm-6am).
Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England. Our travel alerts give details of live incidents on our network.
-
09 June 2025
Footbridge replacements set to begin over A259 in Bexhill-on-Sea
The first footbridge connects Lychgates Close and Church Street and the second footbridge connects Hastings Road, over A259 King Offa Way.
During the works there will be a 24/7 lane closure in both directions on the A259. There will also be overnight carriageway closures, and we’ll need to close both carriageways over two full weekends.
Whilst the footbridges are being replaced there will be pedestrian diversion routes.
Phase one - Removal of footbridges
Full weekend closure to the A259 in both directions between the junctions with the A269.
- Friday 5 September (8pm) to Monday 8 September (6am)
Phase two - Installation of lane one closure
Overnight closure to the A259 in both directions
- Monday 8 September (for four nights)
Phase three - Installation of footbridges
Full weekend closure to the A259 in both directions between the junctions with the A269.
- Friday 28 November (8pm) to Monday 1 December (6am)
Diversions:
A259 full weekend and overnight diversion:
Eastbound traffic will be diverted by:
- A2690
- A2691
- A2036
- re-join the A259
Westbound traffic will be diverted by:
- A269
- Magdalen Road
- Upper Sea Road
- A269 to re-join the A259
Pedestrian diversions:
Lychgates Close bridge diversion map
Hastings Road bridge pedestrian diversion mapPlease remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England. Our travel alerts give details of live incidents on our network.
Project information
Documents

Traffic information
Information about scheduled roadworks and events on our motorways and major roads.Sign up for updates!
Keep up to date with what's happening on this scheme by signing up to our updates.