Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 581-590 of 1160 of 1160
M5 St Georges bridge repairs
We’re carrying out essential repairs and improvements to St Georges Bridge that carries the M5 over the railway near junction 21 for Weston-super-Mare. Start date Summer 2024 End date Winter 2028 Cost TBC Latest updates Overview Documents Latest updates 25 July 2025 Overnight resurfacing We're resurfacing the M5 junction 21 southbound exit slip road. To do this the southbound exit slip
…
https://nationalhighways.co.uk/our-roads/south-west/m5-st-georges-bridge-repairs/
M54 to M6 link road
This scheme will provide an improved link between the M54 and the M6. Currently, there's no direct motorway link from the M54 to the M6 north. This means high volumes of both long distance and local traffic use the local roads to travel this route. Start date TBC End date TBC Cost TBC Latest updates Overview Documents Related road projects Latest updates 20 September 2024 Ongoing Prepara
…
https://nationalhighways.co.uk/our-roads/west-midlands/m54-to-m6-link-road/
West Yorkshire motorway safety and maintenance schemes
We’re carrying out maintenance schemes on bridges across Yorkshire, improving safety for thousands of drivers. Start date 7 April 2025 End date March 2026 Cost TBC Overview Documents How we’ll work To work safely, we’ll need a mixture of lane and road closures. We'll work at the least busy times of the day or week to minimise disruption. To minimise disruption to road users, we'll work ov
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/west-yorkshire-motorway-safety-and-maintenance-schemes/
Closed circuit television (CCTV) - privacy notice
This privacy notice sits beneath our top level privacy notice and provides information about how personal data is used with regards to CCTV operated on the motorways and major roads of England (commonly known as the Strategic Road Network), including those fitted into Traffic Officer vehicles. Plea
…
https://nationalhighways.co.uk/about-us/privacy-notice/closed-circuit-television-cctv-privacy-notice/
The M20 Operation Brock contraflow is in operation
We've deployed the M20 contraflow over the summer holiday period Share this article We've deployed the contraflow at the request of the Kent and Medway Resilience Forum. This is due to expected high passenger numbers at the Kent ports over the summer holiday period. Operation Brock is part of a s
…
https://nationalhighways.co.uk/about-us/m20-operation-brock-contraflow/
Apprenticeships - find what's right for you
We believe that there is a role for everybody in construction, whether you have a particular skill, such as with numbers, designing things or even talking to people. In this section What are your skills and interests? You may even have a specific interest, like art, being outdoors or writing – th
…
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/jobs-skills-and-education/apprentices/apprenticeships-find-whats-right-for-you/
Finding pioneering ways to take care of bridges
Published 24 Jan 2024 Technology is rapidly influencing the transport sector. We know we need to keep innovating to improve experiences on the road, while getting people where they need to be, safely and reliably. Share this article Through our Designated Funds Innovation and Modernisation fund,
…
https://nationalhighways.co.uk/our-work/innovation-and-research/news/finding-pioneering-ways-to-take-care-of-bridges/
A120 Stanstead to Panners Interchange maintenance work
Our work includes replacing the safety barrier and road signs, resurfacing, repainting road markings, replacing road studs (cat's eyes) and other routine maintenance activities. This will make sure the A120 around Braintree remains in a safe and serviceable condition. We're doing the work in two phases. Phase 1 was completed during 2023. Phase 2 will be done during 2024. Start date January 2024
…
https://nationalhighways.co.uk/our-roads/east/a120-stanstead-to-panners-interchange-braintree-maintenance-work/
M6 junction 21a to 26 motorway upgrade
We're improving the 10-mile section of the M6 between junctions 21a and 26, by upgrading it to an all-lane running motorway. This will provide increased capacity in a cost-effective way, maximising the use of the existing road. Start date March 2021 End date Spring 2025 Cost £259 million to £285 million Latest updates Overview Documents Latest updates 21 May 2025 Last part of motorway sur
…
https://nationalhighways.co.uk/our-roads/north-west/m6-junction-21a-to-26-motorway-upgrade/
Walkers, cyclists and horse riders in Thurrock, Brentwood and Havering
Over 24 miles of new or improved pathways In this section In Thurrock, Brentwood, and Havering, we are creating new pathways and bridges, as well as improving existing pathways, to better connect the community to heritage areas, equestrian centres, places of employment, parks, and woodlands. Four
…
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/environment/walkers-cyclists-and-horse-riders/walkers-cyclists-and-horse-riders-in-thurrock-brentwood-and-havering/
First
Previous
Page
54
Page
55
Page
56
Page
57
Page
58
Page
59
Page
60
Page
61
Page
62
Page
63
Next
Last