Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 431-440 of 1186 of 1186
A14 Cambridge to Huntingdon
The section of the route between Huntingdon and Cambridge carries a high level of commuter as well as long-distance traffic and provides a strategic link between the A1 and the M11 motorway.
https://nationalhighways.co.uk/our-roads/east/a14-cambridge-to-huntingdon/
100 years of A-roads
2023 marked 100 years since the Great Britain road numbering scheme was introduced. Before this, if you weren’t a local, it was very difficult to tell one road from another.
https://nationalhighways.co.uk/our-roads/100-years-of-a-roads/
Travel Time Reporting Tool
We're committed to sharing more information on the performance of our road network with you.
https://nationalhighways.co.uk/our-roads/travel-time-reporting-tool/
Project profile: Burnden and Darcy Lever viaducts
These graceful, pioneering structures still form part of an escape from town to country, over 170 years after they were first built.
https://nationalhighways.co.uk/our-work/historical-railways-estate/project-profiles/burnden-and-darcy-lever-viaducts/
M6 junction 10 improvement
M6 junction 10 congestion affects the local community and businesses, particularly during morning and evening peak times. The improvements will ease congestion and reduce journey times for the thousands of drivers who use it every day.
https://nationalhighways.co.uk/our-roads/west-midlands/m6-junction-10-improvement/
A36 Limpley Stoke carriageway repairs and stabilisation
We’re carrying out essential safety improvements on the A36 Warminster Road near Limpley Stoke to stabilise the embankment and keep the carriageway safe.
https://nationalhighways.co.uk/our-roads/south-west/a36-limpley-stoke-carriageway-repairs-and-stabilisation/
M3 Bagshot Heath footbridge
We’re replacing the footbridge which carries footpath 184 over the M3 connecting Whitmoor Road, Bagshot and Lightwater Country Park.
https://nationalhighways.co.uk/our-roads/south-east/m3-bagshot-heath-footbridge/
A1 Birtley to Coal House
This section of the A1 suffers congestion, particularly during peak hours, which can result in unreliable journey times. Traffic is also expected to grow with new housing and employment developments planned for the area. Road improvements are needed to support this growth.
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a1-birtley-to-coal-house/
A585 Windy Harbour to Skippool
We’re building a new offline bypass around the village of Little Singleton. The bypass will help to reduce congestion, improve safety, reduce the impact of traffic on the local community, and remove a major bottleneck on the main road to Fleetwood.
https://nationalhighways.co.uk/our-roads/north-west/a585-windy-harbour-to-skippool/
M1 junction 10 to 13 enhancements
We’ll be upgrading 11.2 miles of central reservation barrier in Bedfordshire, upgrading it from steel to concrete, to improve the safety and reliability of journeys along this stretch of the M1.
https://nationalhighways.co.uk/our-roads/east/m1-junction-10-to-13-enhancements/
First
Previous
Page
39
Page
40
Page
41
Page
42
Page
43
Page
44
Page
45
Page
46
Page
47
Page
48
Next
Last