Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 381-390 of 1192 of 1192
A14 Ipswich maintenance, junction 52 (Claydon) to junction 55 (Copdock Interchange)
We're doing essential maintenance work on the A14 at Ipswich between junction 52 (Claydon) and junction 55 (Copdock Interchange, where the A14 meets the A12) to extend the life of the road surface, to minimise the need for more extensive repairs in the future. Start date September 2024 End date No
…
https://nationalhighways.co.uk/our-roads/east/a14-ipswich-junction-52-claydon-to-junction-55-copdock-interchange/
A5 Stony Stratford to Portway concrete surface repairs and maintenance
We'll be carrying out repairs and maintenance on stretches of the concrete road surface on the A5 between Stony Stratford and Portway in both directions, as well as other repairs and maintenance for approximately six weeks starting January 2025. The work will include repairs to the concrete surface
…
https://nationalhighways.co.uk/our-roads/east/a5-stony-stratford-to-portway-concrete-surface-repairs-and-maintenance/
A11 Red Lodge to Barton Mills concrete surface repairs and maintenance
We're repairing and maintaining a stretch of the A11 concrete road surface in both directions between Red Lodge and Fiveways Roundabout at Barton Mills, West Suffolk. Start date January 2025 End date February 2025 Cost £1.26 million Latest updates Overview Documents Latest updates 28 January
…
https://nationalhighways.co.uk/our-roads/east/a11-red-lodge-to-barton-mills-concrete-surface-repairs-and-maintenance/
A421 Marston Moretaine pump station replacement
We'll replace and relocate the control system for the pumping station on the A421 at Marston Moretaine in Bedfordshire, following severe flooding during 2024. Start date Mid February 2025 End date August 2025 Cost TBC Latest updates Overview Documents Latest updates 16 July 2025 Closures fr
…
https://nationalhighways.co.uk/our-roads/east/a421-marston-moretaine-pump-station-replacement/
A14 junctions 16 to 17 drainage work
We’re putting in new drainage on the A14 near Spaldwick and Bythorn in Cambridgeshire to help reduce future flooding. Start date 3 March 2025 End date June 2025 Cost TBC Latest updates Overview Documents Latest updates 14 May 2025 Latest road closure dates We're installing new drains on th
…
https://nationalhighways.co.uk/our-roads/east/a14-junctions-16-to-17-drainage-work/
M56 junction 6 to 8 smart motorway
We will build an all-lane running motorway on the M56 between junctions 6 and 8. This will provide increased capacity in a cost-effective way, maximising the use of the existing road Start date Spring 2020 End date June 2023 Cost TBC Latest updates Overview Documents Latest updates 11 July 2
…
https://nationalhighways.co.uk/our-roads/north-west/m56-junction-6-to-8-smart-motorway/
M6 Clifton bridge replacement
Network Rail is replacing the existing bridge that carries the West Coast Main Line over the M6, between junction 39 and 40 near Penrith in Cumbria. Start date January 2025 End date June 2026 Cost £60 million Latest updates Overview Documents Latest updates 27 March 2025 Preparations progre
…
https://nationalhighways.co.uk/our-roads/north-west/m6-clifton-bridge-replacement/
Hindhead Tunnel
The Hindhead Tunnel in Surrey is just under two kilometres long and is one of the longest road tunnels in the UK. It takes the A3 beneath the Devil's Punch Bowl, a Site of Special Scientific Interest. Latest updates Overview Documents Related road projects Latest updates 20 March 2025 Overnig
…
https://nationalhighways.co.uk/our-roads/south-east/hindhead-tunnel/
A38 Saltash Tunnel technology upgrade
The Saltash Tunnel in Cornwall provides a key link between Plymouth and South-East Cornwall. We’re carrying out an extensive programme of work to update the technology in and around the tunnel to keep journeys safe and reliable, and reduce the risk of unplanned closures. Start date Early 2025 End
…
https://nationalhighways.co.uk/our-roads/south-west/a38-saltash-tunnel-technology-upgrade/
A63 South Cave to North Ferriby safety barrier and lighting renewal
As part of our essential safety maintenance we are replacing the safety barrier and upgrading the lighting between South Cave and North Ferriby along with resurfacing the footbridge at Elloughton, to keep road users safe for years to come. Start date June 2024 End date Spring 2025 Cost TBC Lates
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/a63-south-cave-to-north-ferriby-safety-barrier-and-lighting-renewal/
First
Previous
Page
34
Page
35
Page
36
Page
37
Page
38
Page
39
Page
40
Page
41
Page
42
Page
43
Next
Last