Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 21-30 of 302 of 302
Post Opening Project Evaluation (POPE) of major schemes - National Highways
…
one-year after report A1 Coal House to Metro Centre - 1-year-after report A5-M1 Dunstable Northern Bypass - 1-year-after-report A21 Tonbridge to Pembury dualling - 1-year-after report M1 junctions 10 to 13 hard shoulder running and junction improvements - 5-year-after report M1 junctions 28 to
31
…
…
…
https://nationalhighways.co.uk/our-roads/post-opening-project-evaluation-pope-of-major-schemes/
Social Value Fund and Community Fund - National Highways
…
and can demonstrate a link to the A428 Black Cat to Caxton Gibbet improvements will contribute to National Highways social value pillars: Economic prosperity, Improving the environment, Community wellbeing, Equality, diversity will only involve capital costs will be complete and invoiced by
31
…
https://nationalhighways.co.uk/our-roads/a428-black-cat-to-caxton-gibbet/social-value-fund-and-community-fund/
Variable speed limits - National Highways
…
FOI Act Section
31
would apply where we consider that the release of such records into the public domain would likely be detrimental to the interests of law enforcement.
…
…
View the Information Commissioner’s Guidance on Section
31
of the FOI Act here
…
https://nationalhighways.co.uk/road-safety/variable-speed-limits/
High Speed 2 (HS2) works on National Highways network - National Highways
…
A46 Stivichall Interchange (Festival Island) to Thickthorn Island (A452 for Leamington and Kenilworth) - until
31
July 2025 Lane 1 (nearest to verge) closed in each direction for finishing work to recently installed box structure.
…
…
A temporary 50mph speed limit will be in place on both carriageways for the duration of these works to ensure the safety of the road users and our workforce,
…
https://nationalhighways.co.uk/our-roads/west-midlands/high-speed-2-hs2-works-on-national-highways-network/
M6 Clifton bridge replacement - National Highways
…
Roadworks from Monday
31
March 2025 to March 2027 The following traffic management will be in place on a three-mile section of the M6 between junction 39 (Shap) and 40 (Penrith): lane closures, narrow lanes and a 40mph speed limit two lanes (of three) running in both directions during the day one
…
…
Where: Clifton Primary School, CA10 2EG When: Monday
31
M
…
https://nationalhighways.co.uk/our-roads/north-west/m6-clifton-bridge-replacement/
Working with us - National Highways
…
proposal should make it clear how these improvements are going to be monitored and evaluated against defined performance indicators and targets 7. improve the efficiency of our road network and/or our operations 8. demonstrate that the project phase which you're seeking funding for can be completed by
31
…
https://nationalhighways.co.uk/our-work/designated-funds/working-with-us/
Design Manual for Roads and Bridges (DMRB) - National Highways
…
The DMRB has been launched in a new consistent format and with a new website interface.
31
March 2020 The launch has: brought the DMRB up to date made it less ambiguous, more concise and easier to use enabled a digital framework for standards content that will support innovation in d
…
https://nationalhighways.co.uk/suppliers/design-standards-and-specifications/design-manual-for-roads-and-bridges-dmrb/
M6 junction 19 - National Highways
…
Start date March 2020 End date Completed April 2022 Cost £
31
million to £66 million Overview Documents Project information Overview This busy junction is currently used by around 65,000 vehicles each day and is in need of improvement to meet the expected increase in traffic coming f
…
https://nationalhighways.co.uk/our-roads/north-west/m6-junction-19/
Closed circuit television (CCTV) - privacy notice - National Highways
…
Our CCTV data is retained for seven days, unless an incident has been tagged in which case it will be stored for
31
days and then deleted. Not all incidents are tagged. Who do we share your data with?
…
https://nationalhighways.co.uk/about-us/privacy-notice/closed-circuit-television-cctv-privacy-notice/
Yorkshire and North East - National Highways
…
s junction A A61 Westwood roundabout and A628 Woodhead Pass A A63 Castle Street A A63 South Cave to North Ferriby safety barrier and lighting renewal A A66 Bowes to Cumbrian border central barrier and signage upgrades - 6 May 2025 - Autumn 2025 A A66 Northern Trans-Pennine M M1 junction 30 to
31
…
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/
First
Previous
Page
1
Page
2
Page
3
Page
4
Page
5
Page
6
Page
7
Page
8
Page
9
Page
10
Next
Last