Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 251-260 of 762 of 762
Equality, diversity and inclusion
Our commitment to equality, diversity and inclusion (EDI) policies and how these are delivered and monitored.
https://nationalhighways.co.uk/about-us/equality-diversity-and-inclusion/
Traffic bulletin: Drivers advised to plan journeys ahead of M6 wide load movement
Bulletin warning drivers of a wide load.
https://nationalhighways.co.uk/traffic-bulletin-drivers-advised-to-plan-journeys-ahead-of-m6-wide-load-movement/
Drivers using the M4 near Bristol warned of full weekend closure
National Highways is warning road users that the M4 north of Bristol will be closed for a full weekend in October as part of the work on the A432 Badminton Road Bridge.
https://nationalhighways.co.uk/drivers-using-the-m4-near-bristol-warned-of-full-weekend-closure/
New Non-Executive Director appointed to National Highways Board
After a fair and open competition, Kim Shillinglaw is to join National Highways on 10 February 2025 as a Non-Executive Director of the Board.
https://nationalhighways.co.uk/new-non-executive-director-appointed-to-national-highways-board-2/
M4 to Dorset coast strategic study
We have completed a study to consider whether there is an alternative key north-south route between the Dorset coast and the M4. The aim of the study was to identify which corridor(s) could provide the main route and potential enhancements.
https://nationalhighways.co.uk/our-roads/south-west/m4-to-dorset-coast-strategic-study/
M3 Bagshot Heath footbridge
We’re replacing the footbridge which carries footpath 184 over the M3 connecting Whitmoor Road, Bagshot and Lightwater Country Park.
https://nationalhighways.co.uk/our-roads/south-east/m3-bagshot-heath-footbridge/
National Highways Bus and Coach Plan
During 2020-2025 (Road Period 2) we are improving our understanding of bus and coach sector needs. We do this by engaging with operators and delivering improvements that make a difference for drivers, operators and passengers. These activities form the basis of our Bus and Coach Plan.
https://nationalhighways.co.uk/our-work/environment/national-highways-bus-and-coach-plan/
Visual Performance Management Minimum Standards V1.2 April 2023 Contents 1 Purpo...
Visual Performance Management Minimum Standards V1.2 April 2023 Contents 1 Purpose of the standard 5 2 Visual performance management at a glance 6 3 Benefits of visual performance management 8 4 What is visual performance management? 9 5 Visual display overview 10 Physical visual performance managem
…
https://nationalhighways.co.uk/media/b3yccpqy/visual-performance-management-minimum-standards.pdf
Register your interest – Supply Chain Directory
National Highways is looking to engage with companies of all sizes – including small to medium size enterprises (SMEs) – who might be interested in working on the Lower Thames Crossing.
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/supply-chain/register-your-interest-supply-chain-directory/
Midlands LED roadside lighting upgrades
We’re cutting carbon emissions in the Midlands by switching to cleaner LED lights, making our motorways and A-roads greener and more energy efficient
https://nationalhighways.co.uk/our-roads/east-midlands/east-and-west-midlands-led-roadside-lighting-upgrades/
First
Previous
Page
21
Page
22
Page
23
Page
24
Page
25
Page
26
Page
27
Page
28
Page
29
Page
30
Next
Last