Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 221-230 of 444 of 444
Smart motorways Emergency area width review – summary report Emergency area widt...
…
/2 14 foot and No action - running 10 inches exceeds 14 foot (4.53 metres) 5 inches in width
M
25 J24 to 23 Anticlockwise B 136/7 14 foot and 8 No action - inches exceeds 14 foot (4.47 metres) 5 inches in width
M
25 J5 to
6
Clockwise A 39/0 13 foot and Widen - to 15 1 inch foot (4.
6
m
…
https://nationalhighways.co.uk/media/linp5di3/brs21_0039_ea_width_summary-report.pdf
Congestion warning ahead of second M62 weekend closure at Rochdale
…
and
6
am on Monday morning (23 September) to allow Network Rail to complete its important bridge replacement work.
…
…
The diversion for eastbound drivers will use the strategic road network with drivers from the
M
66 or clockwise
M
60 travelling to junction 21 of the
M
60 at Chadderton where they should then use the northbound A663 (Broadway) and northbound A627
…
https://nationalhighways.co.uk/congestion-warning-ahead-of-second-m62-weekend-closure-at-rochdale/
Claim Nos. QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE QUEEN’...
…
, SLOWING DOWN, OBSTRUCTING OR OTHERWISE INTERFERING WITH THE FLOW OF TRAFFIC ONTO OR OFF OR ALONG THE A1(
M
), A3, A12, A13, A21, A23, A30, A414 AND A3113 TRUNK ROADS AND THE
M
1,
M
3,
M
4,
M
4 SPUR,
M
11,
M
26,
M
23 AND
M
40 MOTORWAYS FOR THE PURPOSE OF PROTESTING (4) MR ALEXANDER RODGER AND 113 OTHERS Defendants
…
…
The public
…
https://nationalhighways.co.uk/media/yeeh4dq1/qb-2021-003737-national-highways-ltd-v-persons-unknown-order_redacted.pdf
QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVI...
…
MOTORWAY, A2 A20 AND A2070 TRUNK ROADS AND
M
2 AND
M
20 MOTORWAY, A1(
M
), A3, A12, A13, A21, A23, A30, A414 AND A3113 TRUNK ROADS AND THE
M
1,
M
3,
M
4,
M
4 SPUR,
M
11,
M
26,
M
23 AND
M
40 MOTORWAYS FOR THE PURPOSE OF PROTESTING (2) MR ALEXANDER RODGER AND 139 OTHERS Defendants _______________________________
…
…
https://nationalhighways.co.uk/media/b0cjyqp1/25-july-2023-sealed-order-national-highways-v-persons-unknown.pdf
TUESDAY 14 MARCH 2023 IN THE COURT OF APPEAL ON APPEAL FROM KING'S BENCH DIVISIO...
…
of spur from
M
4 Junction 4 to
M
4 Junction 4a),
M
40 (Junction 7 to A40 at Fray’s River Bridge),
M
1 (Junction 1 to Junction 8), A405 (from
M
25 Junction 21A to
M
1 Junction
6
), A1 (from Fiveways Corner roundabout to Hilltop Gardens), and A414 (
M
1
…
https://nationalhighways.co.uk/media/12ufx1pb/bennathan-injunction-order-as-amended-by-the-court-of-appeal-on-14-march-2023-redacted-130766843-1.pdf
M6 and M1 smart motorways Incident and infrastructure investigations – summary r...
…
Independent investigations were carried out into specific sections of the
M6
and
M
1 smart motorways and Smart motorway incident and infrastructure Two of the independent investigation reports (
M6
Junctions 5 to
6
(Bromford investigations reports were produced for: viaduct) and the
M
1
…
https://nationalhighways.co.uk/media/0nactxnf/brs22_0041_m6_and_m1_summary-report_2022_final.pdf
Court of Appeal Ref: CA-2022-001066 and CA-2022-001105 NATIONAL HIGHWAYS LIMITED...
…
AND A3113 TRUNK ROADS AND THE
M
1,
M
3,
M
4,
M
4 SPUR,
M
11,
M
26,
M
23 AND
M
40 MOTORWAYS FOR THE PURPOSE OF PROTESTING (2) MR.
…
…
Justice Holgate dated 2 October 2021 Supporting Witness Statement for
M
25 Injunction 4. Witness Statement of Anthony Nwanodi (without Exhibits) dated 30 September 2021 Claim Forms and Particulars
…
https://nationalhighways.co.uk/media/owunls0y/13-proposed-supplementary-bundle-index-draft.pdf
Movement of abnormal indivisible loads through planned roadworks
…
The width requirement of 4.
6m
may include a nearside overhang of no more than 0.8
m
provided there is no physical obstruction to any carried load, it does not encroach into road worker safety zones and road workers are made aware.
…
…
Notification for these types of loads is made to the Police forces. 10 Movement of Abnormal Indivisible Loads through Planned Roadworks Abnormal Indiv
…
https://nationalhighways.co.uk/media/zcolh4u5/movement-of-abnormal-loads-through-planned-roadworks_report-bhm22_0106.pdf
Safety improvements to begin near Leeds with M1 central barrier upgrade
…
These closures will be between 8pm and
6
am, Sunday – Friday night, for three-and-a-half weeks, with the final closure taking place on 26 March. There will be no closures on Saturday nights during this period. Signed diversions will be in place.
…
…
The outside lane of the
M
1 southbound between junctions 46 and 47 will be closed from 2 March, with the outside lane of the
M
1
…
https://nationalhighways.co.uk/safety-improvements-to-begin-near-leeds-with-m1-central-barrier-upgrade/
Smart motorways Incident and infrastructure investigation M1 Junction 39 to 42 H...
…
The Action Plan included an action to investigate clusters of incidents at locations on the
M6
and
M
1. An evidence-led independent incident and infrastructure investigation Actions was commissioned by us at the four locations and a report produced for each.
…
…
The schemes that completed, are taking forward and those not being taken forward in response to these were reviewed are: r
…
https://nationalhighways.co.uk/media/msfgkfra/ccs0621670228-005_smart-motorways-reports_m1-j39-42.pdf
First
Previous
Page
18
Page
19
Page
20
Page
21
Page
22
Page
23
Page
24
Page
25
Page
26
Page
27
Next
Last