Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 121-130 of 804 of 804
QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVI...
QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVISION AMENDED UNDER THE SLIP RULE Before: Mr Justice Cotter On: 5th May 2023 BETWEEN: NATIONAL HIGHWAYS LIMITED Claimant - and - (1) PERSONS UNKNOWN CAUSING THE BLOCKING OF, ENDANGERING, OR PREVENTING THE FREE FLOW OF TRAFFIC ON THE M25 MOTORWAY, A2 A20 AND A2070 TRUNK ROADS AND M2 AND M20 MOTORWAY, A1(M), A3, A12, A13, A21, A23, A30, A414 AND A3113 TRUNK ROADS AND THE M1, M3, M4, M4 SPUR, M11, M26, M23 AND M40 MOTORW
…
https://nationalhighways.co.uk/media/ug5hk23l/king-s-bench-associate-s-blank-order.pdf
Claim Nos. QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE QUEEN’...
Claim Nos. QB-2021-003576, 003626 and 003737 IN THE HIGH COURT OF JUSTICE QUEEN’S BENCH DIVISION Before the Honourable Mr Justice Chamberlain On 17 March 2022 B E T W E E N: NATIONAL HIGHWAYS LIMITED Claimant -and- (1) PERSONS UNKNOWN CAUSING THE BLOCKING, ENDANGERING, SLOWING DOWN, OBSTRUCTING OR OTHERWISE PREVENTING THE FREE FLOW OF TRAFFIC ONTO OR ALONG THE M25 MOTORWAY FOR THE PURPOSES OF PROTESTING (2) PERSONS UNKNOWN CAUSING THE BLOCKING, SLOWING DOWN, OBSTRUCTING OR OTHERWISE INTERFERING
…
https://nationalhighways.co.uk/media/oyxexp44/queen-s-bench-associate-s-blank-order.pdf
M6 and M1 smart motorways Incident and infrastructure investigations – summary r...
M6 and M1 smart motorways Incident and infrastructure investigations – summary report Update 2022 Incident and infrastructure investigations – summary report update 2022 Introduction In September 2021 we published independent investigation reports alongside our responses to the findings and the actions that we will take. Our actions are targeted at the specific issues identified by the independent investigation reports The Smart motorway evidence stocktake to improve safety at each of the locati
…
https://nationalhighways.co.uk/media/0nactxnf/brs22_0041_m6_and_m1_summary-report_2022_final.pdf
Safety schemes in the South West region - National Highways
We're delivering targeted speed limit reductions on the A40, A46 and A38. This is part of our ongoing commitment to reduce the number of people harmed on the region's roads. Start date Spring 2025 End date TBC Cost TBC Overview Documents What we're doing Safety is and always will be our number one priority. That's why our ambition remains that no-one should be harmed while travelling or working on our roads. Our aim is to improve road safety for all road users by introducing reduced spe
…
https://nationalhighways.co.uk/our-roads/south-west/safety-schemes-in-the-south-west-region/
appendix-a-national-highways-arp4-climate-change-risk-assessment-webpage
Exposure Thresholds Likelihood (vulnerability) matrix Exposure N VL L M H VH Rating 1 2 3 4 5 6 Climate Variable Unit N VL L M H VH Sensitvity Low 1 Highly Unlikely Highly Unlikely Highly Unlikely Unlikely Possible Likely Extreme precipitation % change 0 8.74 15.84 22.93 48.05 73.18 Medium 2 Highly Unlikely Highly Unlikely Unlikely Possible Likely Almost Certain Mean precipitation % change 0 3.77 5.45 7.13 13.08 19.03 High 3 Highly Unlikely Unlikely Possible Likely Almost Certain Almost Certain
…
https://nationalhighways.co.uk/media/rvslhlm4/appendix-a-national-highways-arp4-climate-change-risk-assessment-webpage.ods
Traffic Bulletin: Major closures on the M25 affecting the northbound Dartford crossing and the clockwise M25 near the Surrey/Kent border set to remain in place today
Back Published 21 October 2024 Press Release Drivers are being advised to avoid a section of the M25 as significant disruption is likely to last into the evening as work continues to repair the carriageway following two major incidents. A serious HGV fire was reported shortly after 10pm yesterday (Sunday) between junction 5 near Sevenoaks and junction 6 near Godstone on the clockwise carriageway. Fire crews were at the scene for 10 hours, with the blaze causing major damage to the road sur
…
https://nationalhighways.co.uk/traffic-bulletin-major-closures-on-the-m25-affecting-the-northbound-dartford-crossing-and-the-clockwise-m25-near-the-surreykent-border-set-to-remain-in-place-today/
annex-d-before-vs-after-report-detailed-tables
This document and accompanying data have been prepared by National Highways with assistance from its consultants (where employed). The document and its accompanying data remain the property of National Highways. Recipients of this document should not assume that the data is appropriate for their purposes. In the absence of formal contractual agreement to the contrary, National Highways and its consultants (where employed) expressly disclaim any responsibility to you, or any other party who gains
…
https://nationalhighways.co.uk/media/erehuxdt/annex-d-before-vs-after-report-detailed-tables.ods
Maintenance schemes - South West - National Highways
Maintenance schemes taking place in the South West region. Overview Documents The latest maintenance schemes that will be running in this area can be found below in the 'Project information area'. Project information View a maintenance scheme You can view more details about the maintenance schemes taking place in the South West below: Ash dieback removal – 22 April 2025 to Spring 2026 Our surveys have revealed large numbers of dead or dying Ash trees. These are a potential safety risk to
…
https://nationalhighways.co.uk/our-roads/south-west/south-west-maintenance-schemes/
annex-c-smart-motorways-fourth-year-progress-report-detailed-tables
This document and accompanying data have been prepared by National Highways with assistance from its consultants (where employed). The document and its accompanying data remain the property of National Highways. Recipients of this document should not assume that the data is appropriate for their purposes. In the absence of formal contractual agreement to the contrary, National Highways and its consultants (where employed) expressly disclaim any responsibility to you, or any other party who gains
…
https://nationalhighways.co.uk/media/nqvg4w4u/annex-c-smart-motorways-fourth-year-progress-report-detailed-tables.ods
PROJECT REPORT MIS17 Implementing the highest safe speed within road works - Cas...
PROJECT REPORT MIS17 Implementing the highest safe speed within road works - Case studies and supporting evidence S Glaze, M Palmer, A Rajasooriya and R Sharp Report details Report prepared for: Highways England, CSD Project/customer reference: SPaTS 1-541 & 1-864 Copyright: © TRL Limited Report date: September 2020 Report status/version: 1.2 Quality approval: Cathy Booth George Beard (Project Manager) (Technical Reviewer) G. Beard Disclaimer This report has been produced by TRL Limited (TRL) un
…
https://nationalhighways.co.uk/media/nj3dfuv3/implementing-the-highest-safe-speed-within-road-works-case-studies-and-supporting-evidence.pdf
First
Previous
Page
8
Page
9
Page
10
Page
11
Page
12
Page
13
Page
14
Page
15
Page
16
Page
17
Next
Last