A14 junctions 16 to 17 drainage work

We’re putting in new drainage on the A14 near Spaldwick and Bythorn in Cambridgeshire to help reduce future flooding.

Start date 3 March 2025
End date June 2025
Cost TBC

Latest updates

  • 19 February 2025

    Work starts in March 2025

    Due to flooding issues, we’ll be installing new drains on the A14 near Spaldwick and Bythorn in Cambridgeshire. This will help better disperse surface water, and reduce future flooding.

    We'll need road closures to do the work safely.

    More details will be provided.

    The A14 will be closed between 13 (Thrapston Interchange) and 21 (Brampton), but we'll be working in one direction at a time.

    Diversion routes will be in place. 

    Main diversion

    Non-motorway diversion

Project information

Overview

Due to flooding issues, we’ll be installing new drains on the A14 between Spaldwick and Bythorn in Cambridgeshire. 

The new drainage work will help better disperse surface water, and reduce future flooding.

Documents

Traffic information

Information about scheduled roadworks and events on our motorways and major roads.

Sign up for updates!

Keep up to date with what's happening on this scheme by signing up to our updates.

Feedback