Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 411-420 of 1186 of 1186
Jobs and skills
We want to ensure our local communities can take full advantage of the opportunities on their doorsteps.
https://nationalhighways.co.uk/our-roads/lower-thames-crossing/jobs-skills-and-education/jobs-and-skills/
Roads we manage
We manage the strategic road network in England, comprising motorways and some A roads. Our road network is essential to the growth, wellbeing and balance of the nation’s economy.
https://nationalhighways.co.uk/our-roads/roads-we-manage/
A245 improvements
We're upgrading M25 junction 10 along with the A245, Painshill roundabout and Seven Hills Road junction. These improvements will create faster, safer journeys on the A3 northbound between the M25 and Painshill roundabout.
https://nationalhighways.co.uk/our-roads/m25-junction-10-project-profile/a245-improvements/
The Orwell Bridge
The Orwell Bridge was opened to road traffic in 1982 and carries the A14 (then A45) over the River Orwell just south of Ipswich in Suffolk, England.
https://nationalhighways.co.uk/travel-updates/the-orwell-bridge/
A421 Marston Moretaine pump station replacement
We'll replace and relocate the control system of the pumping station on the A421 at Marston Moretaine in Bedfordshire, following severe flooding during 2024.
https://nationalhighways.co.uk/our-roads/east/a421-marston-moretaine-pump-station-replacement/
M3 junctions 9 to 14: safety barrier upgrade (competed)
Although our smart motorway work has been cancelled following the Government’s latest announcement, we’re continuing to improve safety between junctions 9 and 14 by upgrading the barrier in the central reservation from metal to concrete.
https://nationalhighways.co.uk/our-roads/south-east/m3-junctions-9-to-14-safety-barrier-upgrade/
A11 Red Lodge to Barton Mills concrete surface repairs and maintenance
We're repairing and maintaining a stretch of the A11 concrete road surface in both directions between Red Lodge and Fiveways Roundabout at Barton Mills, West Suffolk.
https://nationalhighways.co.uk/our-roads/east/a11-red-lodge-to-barton-mills-concrete-surface-repairs-and-maintenance/
A14 junctions 16 to 17 drainage work
We’re putting in new drainage on the A14 near Spaldwick and Bythorn in Cambridgeshire to help reduce future flooding.
https://nationalhighways.co.uk/our-roads/east/a14-junctions-16-to-17-drainage-work/
M56 junction 6 to 8 smart motorway
We will build an all-lane running motorway on the M56 between junctions 6 and 8. This will provide increased capacity in a cost-effective way, maximising the use of the existing road.
https://nationalhighways.co.uk/our-roads/north-west/m56-junction-6-to-8-smart-motorway/
M40/M42 interchange safety barrier upgrade
The M40/M42 interchange is frequently congested at peak times, affecting both local journeys and long distance traffic between London and Scotland. Major new developments in Birmingham, Solihull and the Black Country will also increase demand on the junction.
https://nationalhighways.co.uk/our-roads/west-midlands/m40m42-interchange-safety-barrier-upgrade/
First
Previous
Page
37
Page
38
Page
39
Page
40
Page
41
Page
42
Page
43
Page
44
Page
45
Page
46
Next
Last