Warning Javascript is turned off
For the best experience please use a JavaScript enabled browser.
Skip to content
Homepage
Accessibility
Contact us
Listen to this website
About us
Publications
Media centre
Submit your search
Site search
Submit site search
Toggle navigation
Home
Our roads
Our work
Road safety
Suppliers
Help centre
Careers
Search
Search National Highways
Search
Showing 161-170 of 588
Court of Appeal proceedings judgment and documents
Judgment and documents relating to National Highways Limited’s appeal of the Orders of the Honourable Mr Justice Bennathan dated 9 May 2022 (sealed on 12 May 2022) - CA-2022-001066 & CA-2022-001105
https://nationalhighways.co.uk/about-us/high-court-injunctions-for-motorways-and-major-a-roads/appeals-ca-2022-001066-ca-2022-001105/
HelmUK final report 14 July 2022 Abstract HelmUK was the UK’s first real-world t...
HelmUK final report 14 July 2022 Abstract HelmUK was the UK’s first real-world trial of HGV platooning which ran between 2017 and 2022. The concept of platooning is to use advanced driver assistance systems to enable HGVs to safely travel close together to save fuel via a slipstreaming effect. This concept has never been tested in a real-world environment in the UK. HelmUK ran for 5 years and thro
…
https://nationalhighways.co.uk/media/ggcjaat5/helmuk-final-report.pdf
M67 St Anne’s Road bridge replacement project
The bridge that carries St Anne’s Road over the M67 motorway needs extensive repairs.
https://nationalhighways.co.uk/our-roads/north-west/m67-st-anne-s-road-bridge-replacement-project/
A3 Ham Barn Roundabout resurfacing West Liss
Essential resurfacing at Ham Barn Roundabout and the approaching slip roads on the A3 at West Liss.
https://nationalhighways.co.uk/our-roads/south-east/a3-ham-barn-roundabout-resurfacing-west-liss/
Travel Time Reporting Tool
We're committed to sharing more information on the performance of our road network with you.
https://nationalhighways.co.uk/our-roads/travel-time-reporting-tool/
M1 junction 32 to 35a emergency area retrofit
From June 2023 we are set to build an additional 12 emergency areas on the M1 between junction 32 (Thurcroft) and junction 35a (Stocksbridge). This is in addition to the existing 8 emergency areas.
https://nationalhighways.co.uk/our-roads/yorkshire-and-north-east/m1-junction-32-to-35a-emergency-area-retrofit/
M3 junctions 2 to 4a all lane running One-year post opening project evaluation W...
M3 junctions 2 to 4a all lane running One-year post opening project evaluation While Highways England has made every effort to ensure the information in this document is accurate, Highways England does not guarantee the accuracy, completeness or usefulness of that information; and it cannot accept l
…
https://nationalhighways.co.uk/media/cpydvwzn/m3-junctions-2-to-4a-all-lane-running-one-year-post-opening-project-evaluation.pdf
M4 resurfacing between junctions 6 and 7 - 15 to 17 March 2025
We'll close the M4 westbound between junctions 6 and 7 for urgent resurfacing. We'll close the road from 6am Saturday 15 March and reopen it by 6am Monday 17 March.
https://nationalhighways.co.uk/our-roads/south-east/m4-resurfacing-between-junctions-6-and-7/
Supply chain leadership
This page provides resources to support leaders across National Highways' supply chain.
https://nationalhighways.co.uk/suppliers/health-safety-and-wellbeing/home-safe-and-well/supply-chain-leadership/
Specialist Professional and Technical Services (SPATS) Framework Lot 1 & Lot 2 T...
Specialist Professional and Technical Services (SPATS) Framework Lot 1 & Lot 2 Task 1127 Smart Motorway Incident and Infrastructure Investigation – M1 Junction 39 to 42 July 2021 Smart Motorway Incident and Infrastructure Investigation Lot 1 SPATS Framework Executive Summary This report has been prepared as part of Highways England’s response to the Government’s Smart Motorway
Safety
E
…
https://nationalhighways.co.uk/media/vcfkvvje/smiii-report-m1-j39-42.pdf
First
Previous
Page
12
Page
13
Page
14
Page
15
Page
16
Page
17
Page
18
Page
19
Page
20
Page
21
Next
Last