A1 Brampton Hut Roundabout maintenance
We're doing important road maintenance at the A1 Brampton Hut Services Roundabout near Huntingdon to help surface water drain away more effectively and reduce the risk of flooding from September 2026 to February 2027.
Work has started
Our first phase of overnight work runs from Monday 28 September, and we’re working Mondays to Fridays from 9.30pm to 5am on the exit slip road and services entry road.
Lane closure
For our safety and yours, we'll close one lane on Brampton Hut Roundabout, the A1 northbound exit slip road and the A141 eastbound link during the day throughout our work.
Road closures
For safety, we'll need the following overnight road closures:
Monday 28 September to mid November - A1 northbound exit slip and entry road into services
Closed overnight (9.30pm-5am) Monday to Friday.
The exit from the services will remain open.
Diversion
- continue north and exit the A1 at Alconbury (B1043)
- re-join the A1 southbound to exit at Brampton Hut Interchange
A1 northbound exit slip diversion map
Monday 28 September to mid November - A141 eastbound link between A14 junction 21 and Brampton Hut Roundabout
Closed overnight (9.30pm-5am) Monday to Friday.
Diversion:
- join the A14 westbound at junction 21
- travel west to junction 16 (Catworth Interchange) and re-join the A14 eastbound
- travel east on A14 towards junction 23 (Ermine St Interchange)
- exit and return westbound
- at A14 junction 22 join the A1 northbound and exit the A1 at Alconbury (B1043)
- re-join the A1 southbound to exit at Brampton Hut Interchange
A1 eastbound exit slip diversion map
Tuesday 10 November until mid January (with the exception of the Black Friday and Christmas holiday periods) - North and West quarters of Brampton Hut roundabout
Closed overnight (9pm-5am) Monday to Friday.
Diversion:
- from Brampton Hut Roundabout, traffic will be diverted west on the A141 link towards A14 junction 21
- at the roundabout return east on the A141 link towards Brampton Hut Roundabout
- take the A1 northbound entry slip
- to join the A141 eastbound towards Huntingdon, exit the A1 northbound at Alconbury (B1043)
- re-join the A1 southbound to exit at Brampton Hut Interchange and join the A141 eastbound
Please note that there will be no emergency vehicle access during the work.
Background
Around 40,000 vehicles a day use this route and around 26% are heavy good vehicles, making it a critical national freight route.
We're upgrading the kerbs for this roundabout to better cope with these large vehicles, and cope with heavy rainfall.
Our work will help surface water drain away more effectively and reduce the risk of flooding.
The work is being delivered in phases, and we’ll be:
- strengthening drainage kerbs
- resurfacing the road
- replacing road markings
- installing new traffic signal sensors
Please remember that closures can change at short notice. You can check the latest information on our daily closures page. Our travel alerts give details of live incidents on our network.
Project information
Documents
Traffic information
Information about scheduled roadworks and events on our motorways and major roads.Sign up for updates!
Keep up to date with what's happening on this scheme by signing up to our updates.