South East - Maintenance schemes

Maintenance schemes taking place in the South East region.

Project information

Maintenance work on the A2

You can view more details about the maintenance schemes taking place on the A2 below:

Maintenance work on the A20

You can find more details about the maintenance schemes taking place on the A20 below:

Maintenance work on the A2070

You can find more details about the maintenance schemes taking place on the A2070 below:

Work

We'll be working in phases to resurface the A2070 near Ashford. The first phase involves closing the stretch between the Avenue Jacques Faucheux and The Boulevard.

Closures

The road will be closed eastbound only overnight from Monday 2 June until Monday 9 June. 

The subsequent phases of work will be: 

Tuesday 10 - Friday 13 June: Avenue Jacques Faucheux and The Boulevard (westbound)

Monday 16 - Friday 20 June: The Boulevard to the M20 Link Roundabout (eastbound) 

Monday 23 – Friday 26 June: M20 Link Roundabout to The Boulevard (westbound)

Monday 30 – Wednesday 9 July: M20 Link Roundabout to M20 Gyratory (eastbound and westbound) 

Thursday 10 – Friday 11 July : A2070 Sevington Link Roundabout (only) closed 

Diversion

Traffic will be diverted to

  • A2042 from Avenue Jacques to M20 J10 – 10A.

When the Sevington link roundabout is closed traffic will be diverted to A20, then M20 J10 – 10A

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England. Our travel alerts give details of live incidents on our network.

Work

We're carrying out improvement works on the A2070 between Cloverleaf and M20 J10/10A.

The works involve a carriageway resurfacing scheme including loop technology and road marking renewal to improve the condition of the road and to aid the safety of road users. 

At the same time as these essential works, we will also carry out horticultural maintenance and litter picking.

Closures

Traffic management will consist of mostly lane closures and full carriageway closures in six phases to safely deliver the works and reduce impact on customers.

Works will be carried out at night from June 2 to July 11 from between 8pm and 6am.

Phasing (dates inclusive)

Closure: 2 June – 9 June

  • Phase 1 - Ave Jacques Faucheux to The Blvd (eastbound)

Closure: 10 June – 13 June

  • Phase 2 - The Blvd to Ave Jacques Faucheux (westbound) 

Closure: 16 June – 20 June

  • Phase 3 - The Blvd to M20 Link Roundabout (eastbound) 

Closure: 23 June – 26 June

  • Phase 4 - M20 Link Roundabout to Blvd (westbound) 

Closure: 30 June – 9 July

  • Phase 5 - M20 Link Roundabout to M20 Giratory (eastbound) 

Closure: 10 July – 11 July 

  • Phase 6 – A2070 Sevington Link Roundabout (Only) 

Diversions

Diversions, which have been agreed and approved by Kent County Council:

For Phase 1,2,3 and 4:

Traffic will be diverted to

  • A2042 from Avenue Jacques to M20 J10 – 10A. 

For Phase 5:

Traffic will be diverted to

  • A20, then M20 J10 – 10A

We're keeping disruption to a minimum by working at night when traffic levels are lower. However, our work will generate some noise, so we would like to apologise in advance for any disturbance this may cause you.

The essential improvements will ensure drivers continue to have smooth and reliable journeys on this part of the road network.

Maintenance work on the A21

You can find more details about the maintenance schemes taking place on the A21 below:

Maintenance work on the A23

You can find more details about the maintenance schemes taking place on the A23 below:

We're performing surveys on the A23 northbound off-slip road for the A281 West Road in Pyecombe, West Sussex.

Closures

A23 northbound lane and northbound A281 off-slip road

Closed overnight (8pm - 6am) on these dates:

  • Tuesday 27 May to Friday 30 May
  • Monday 2 June to Friday 6 June

Northbound A281 off-slip road closure diversion

  • continue on the A23 northbound to the Bolney junction (A272)
  • take the A272 Cowford Road west to the junction with the A281 (at Cowford)
  • head south on the A281 to Henfield
  • stay on the A281 south, back to the A23 at Pyecombe

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England site. Our travel alerts give details of live incidents on our network.

The A23 Brighton Road will be closed overnight between the Farthing Way roundabout and Glebe Road in Hooley from Monday 9 June through to Saturday 28 June. Between Monday and Thursday the closure will start each evening at 10pm and the road will reopen at 5.30am. On Fridays the closure will start at 11pm and the road will reopen at 6am. There may also be some closures on Saturday and Sunday nights which will be from 10pm to 6am on Saturdays and 10pm to 5.30am on Sundays.

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England site. Our travel alerts give details of live incidents on our network.

 

Maintenance work on the A259

You can find more details about the maintenance schemes taking place on the A259 below:

Maintenance work on the A26

You can find more details about the maintenance schemes taking place on the A26 below:

Maintenance work on the A260

You can find more details about the maintenance schemes taking place on the A260 below:

Maintenance work on the A27

You can find more details about the maintenance schemes taking place on the A27 below:

We need to do drainage, barrier replacement and resurfacing works on the A27 between the Patcham Interchange and A27 Lewes Road. 

For safety, we'll use:

  • day and night time lane closures
  • speed restrictions
  • overnight closures of the A27.

Works have progressed well and we’re now due to finish ahead of the original published date of 6 June. 

To achieve this, we need the following full closure (subject to severe weather) on the A27 between Patcham Interchange and Lewes Road. This is to remove the temporary safety barriers and narrow lane arrangements.

Westbound, full closure:

Thursday 8 May, Friday 9 May, Saturday 10 May (8pm to 6am)

  • Lane 2 will remain closed throughout during the daytime, with both lanes available again from 6am Sunday 11 May

Eastbound, full closure:  

Sunday 11 May, Monday 12 May, Tuesday 13 May (8pm to 6am)

  • Lane 2 will remain closed throughout during the daytime, with both lanes available again from 6am Wednesday 14 May

We also need to resurface lane two of the eastbound carriageway. For safety, the A27 will be closed eastbound between Patcham Interchange and Lewes Road, 8pm on Friday 16 May to 6am on Saturday 17 May. 

Diversion:

  • A23 into Brighton
  • A270 east
  • rejoin the A27 at Lewes Road 

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England website. Our travel alerts give details of live incidents on our network.

Closed eastbound overnight between A27/A3M junction to A3023 Havant/Langstone junction from Monday 23 June to Saturday 28 June.

Diversion

A diversion will be in place by the B2177 Bedhampton Road and the B2149 New Road/Park Road. It is likely to take 10-15 minutes.

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England site. Our travel alerts give details of live incidents on our network.

Maintenance work on the A228

You can find more details about the maintenance scheme taking place on the A228 below:

Maintenance work on the A3

You can find more details about the maintenance schemes taking place on the A3 below:

Maintenance work on the A303

You can find more details about the maintenance schemes taking place on the A303 below:

There are two remaining overnight closures of the eastbound stretch between the Picket Twenty junction to the A34 Bullington Cross junction. 

We will then be closing the eastbound stretch between Barton Stacey and Bullington Cross every weeknight from 9pm until 6am starting Monday 2 June through to the morning of Saturday 5 July.

 

Maintenance work on the A31

You can find more details about the maintenance schemes taking place on the A31 below:

We're working on the A31 near Henbury at night from Monday 9 June to Wednesday 11 June. The road will be closed in both directions at night between the Roundhouse roundabout to Lake Gates Roundabout 

Diversion routes

Diversion via A350, A35 and A349

Maintenance work on the A34

You can find more details about the maintenance schemes taking place on the A34 below:

Work

We’re doing maintenance work to renew road markings on the A34 near Chieveley to the M40. 

We’ll work weeknights only (9pm to 6am) from Monday 16 June to October 2025, weather permitting. 

Closures and diversions

To work safely, we'll need the following road closures:

16 June to 21 June 

  • A34 northbound to M40 junction 9

Traffic will be diverted via:

  •  A44
  • A4095
  • B4030 to join the A41 westbound to join the 40 junction.

23 June to 28 June 

  • A34 northbound Milton to Hinskey Hill 

Traffic will be diverted via:

  •  A4130
  • A417 Reading Road
  • Wallingford Street
  • Seesen Way
  • A420 to rejoin the A34 at Botley Interchange.

30 June to 2 July 

  • A34 northbound Hinskey Hill to Peartree

traffic will be diverted via:

  • A423
  • A4142
  • A40
  • A44 to rejoin the A34 at Peartree Roundabout. 

Please remember that closures can change at short notice. You can check the latest information on our daily closures page or find live travel information on our Traffic England. Our travel alerts give details of live incidents on our network.

Maintenance work on the A404

You can find more details about the maintenance schemes taking place on the A404 below:

Maintenance work on the B2500

You can find more details about the maintenance schemes taking place on the B2500 below:

The bridge that carries the B2500 Watling Street, directly above the A282, in Dartford will be closed in both directions each night (10pm to 6am) from Tuesday 27 May until Saturday 31 May and again from Monday 2 June until Saturday 7 June.

Access for residents and businesses on both sides of the bridge will be maintained but it won’t be possible to drive across the bridge during our hours of work. Access will also be maintained for pedestrians and cyclists. Please speak to a member of our team who will pause work where necessary and safely escort you across the bridge. 

The bus routes 96 and 428 will be diverted via A296 Princes Road. Some delays are expected during our working hours.

Diversion routes

A signed diversion route will be in place via the A296 Princes Road, Princes Road Interchange (A282 junction 1b) and A296 Park Road.

Maintenance on the M1

You can find more details about the maintenance schemes taking place on the M1 below:

We're renewing more than 500 metres of motorway boundary fence on the M1 northbound near junction 1 in Hendon, starting 7 April 2025 and finishing in \july 2025.

To minimise disruption, our work will take place overnight, from 9pm to 5.30am, Monday to Friday.

For safety, regular overnight lane closures (9pm to 5:30am) will be in place on the M1 northbound carriageway from April to July 2025. One lane will remain open for northbound traffic.

The link road from the A406 North Circular Road westbound to the M1 northbound will be closed overnight, but access to the M1 will still be available via the Staples Corner Roundabout.

We won’t need any traffic restrictions on the adjacent M1 southbound carriageway to complete this work. The overnight lane closures on the northbound carriageway will be removed by 5.30am each morning ahead of busier daytime use.

Maintenance work on the M11

You can find more details about the maintenance schemes taking place on the M11 below:

Maintenance work on the M2

You can find more details about the maintenance schemes taking place on the M2 below:

Maintenance work on the M20

You can find more details about the maintenance schemes taking place on the M20 below:

Maintenance work on the M23

You can find more details about the maintenance schemes taking place on the M23 below:

Maintenance Work on the M25

You can find more details about the maintenance schemes taking place on the M25 below:

Essential resurfacing starts soon on the M25 anticlockwise carriageway at junction 2, Darenth Interchange in Kent.

For safety, the M25 will be closed anticlockwise, between the slip roads at junction 2:

  • 10pm Saturday 26 April until 7am Sunday 27 April 2025
  • 10pm Saturday 10 May until 7am Sunday 11 May 2025
  • 9pm Saturday 17 May until 9am Sunday 18 May 2025

Diversion 

A short diversion will be in place via the junction 2 anticlockwise exit slip road, through the Darenth Interchange roundabout, and back onto the M25, using the junction 2 anticlockwise entry slip road.

Maintenance work on the M271

You can find more details about the maintenance schemes taking place on the M271 below:

Maintenance work on the M3

You can find more details about the maintenance schemes taking place on the M3 below:

Maintenance work on the M4

You can find more details about the maintenance schemes taking place on the M4 below:

Traffic information

Information about scheduled roadworks and events on our motorways and major roads.

Sign up for updates!

Sign up for details of roadworks in this region.

Feedback