View a maintenance scheme

You can more details about the maintenance schemes taking place in the East Midlands below:

We’ll be carrying out structural maintenance work to Spital Road Bridge (also known as A1 Blyth Flyover) from the 26 June 2021 until 3 September 2021.

The work will include concrete repairs and installing cathodic protection installation; which is a technique used to protect metallic structures.

What is happening and when?

A1 Blyth Flyover on Spital Road will be closed completely from 28 June 2021 until the work is complete, which will be in early September. Work on the bridge will take place during the day.

We will also be closing the A1, one carriageway at a time, beneath the bridge from 26 June 2021, while work is carried out overnight.

Overnight works will take place Monday to Friday, 8pm to 6am. Outside of these hours the A1 and A1(M) remain open as normal.

  • A1 northbound will be closed overnight from 26 July 2021 for 10 nights
  • A1 southbound will be closed overnight from 09 August 2021 for 11 nights

We’d encourage drivers to stick to speed limits and follow appropriate signage to ensure the safety of those working on site and fellow road users.

We will do our very best to complete the work as quickly as possible, keeping disturbances and noise to a minimum.

Diversion Routes

Clearly signed diversion routes, agreed with the Local Authority, will be in place during any closures and we’d advise all motorists to stick to them as they have been chosen with both suitability and safety in mind.

Diversion route for traffic using A1 northbound:

At A57 Worksop junction head west towards Worksop and follow the A57 until M1 junction 31. Join M1 northbound and exit at junction 32 onto M18 northbound. Follow M18 until junction 2 (A1(M) junction 35) where diversion ends.

Diversion route for traffic using A1(M) southbound:

At junction 35 exit onto M18 southbound (junction 2) heading towards M1. M18 ends, follow signs for M1 (junction 32) heading The South / Nottingham. Exit M1 at junction 31 and join A57 eastbound towards Worksop. Follow A57 eastbound until junction with A1 (Apleyhead Interchange) where diversion ends.

 

Local Community Diversion:

Please note: Traffic will not be able to cross the A1 on Spital Road bridge. Instead travel through Blyth on High Street, onto B6045 Bawtry Road and join A1 southbound at Blyth.

PLEASE NOTE: This route is not suitable for all A1/A1(M) traffic due to restrictions within the village.

Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

For up to date details of closures please check our travel updates page.

We are carrying out essential maintenance and resurfacing along the A14 carriageway and slip roads at junctions 3, 4, 7 and 8.

The work is being carried out overnight, Monday to Friday, 8pm to 6am.

We will not work on more than one slip road at a time and will always keep one carriageway of the A14 open.

During slip road closures the main carriageway will either operate under lane closures or be closed completely with a diversion route in place.

What are we doing when?

At A14 junctions 3, 7 & 8 we will resurface the carriageway, exit and entry slip roads, renew road marking and studs, replace damaged ironworks and signs, and clean gullies along the carriageway.

At junction 4 we will resurface patches of the carriageway and resurface and clear the footpath next to the entry slip road.

At junction 6 we will clear vegetation from the slip roads.

Closures:

6 to 10 September - Junction 6 westbound exit and

entry slip roads

A14 westbound lane 1 closed

7 September – Junction 8 westbound entry slip road

A14 westbound closed overnight from junction 8 to

junction 2

8 September – Junction 3 westbound exit slip road

A14 westbound lane 1 closed

13 & 14 September - Junction 4 eastbound entry slip

road

A14 eastbound lane 1 closed

13 & 14 September - Junction 6 eastbound entry slip

road

A14 eastbound lane 1 closed

14-17 September - Junction 7 eastbound exit slip road

A14 eastbound lane 1 closed

Diversion Routes

All diversion routes will be clearly signed

For slip road only closures

Traffic will be instructed to continue to the next appropriate junction on the A14, exit and return on the opposite carriageway until they reach their destination junction.

For full main A14 carriageway closures

Eastbound carriageway closure from junction 2 to junction 8

  • Traffic will be diverted at junction 2 to head south onto the A508 heading towards Northampton.
  • At Northampton, traffic will be directed through Moulton Park on the A5076 until the roundabout junction with the A43 at Round Spinney Industrial Estate.
  • At this roundabout traffic will be directed north onto the A43 travelling towards Kettering until arriving at the A14 eastbound at junction 8 where diversion ends.

Westbound carriageway closure from junction 8 to junction 2

  • Traffic will be diverted at junction 8 to head south on the A43 towards Northampton.
  • At Northampton, traffic will be directed west through Moulton Park on the A5076 (signposted to A508).
  • At the junction with the A508 they will be directed to travel north towards Market Harborough. At A14 junction 2 diversion ends.

 

Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

For up to date details of closures please check our travel updates page.

We’ll be repainting the fire-damaged paintwork on the Alfreton Road bridge, over the A38 northbound carriageway, at Broadmeadows, Alfreton. We will be assessing the bridge for any damage that may have been caused by the fire. To minimise disruption as much as possible, works will take place overnight, from 26 July 2021 until late September 2021.

We will work Monday to Friday, between the hours of 8pm and 6am. During these hours:

  • The A38 northbound will be closed between Watchorn roundabout and M1 junction 28
  • The A38 southbound will have a lane 2 restriction in place between M1 junction 28 and boundary of works

Outside of these hours the road will remain open as normal. We will do our very best to complete the work as quickly as possible, keeping disturbances and noise to a minimum. Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

For up to date details of closures, please visit our travel updates page.

Diversion Routes

Clearly signed diversion routes agreed with the Local Authority will be in place during closures. We’d encourage drivers to stick to speed limits and follow appropriate signage to ensure the safety of themselves, those working on site and fellow road users.

Diversion route for traffic using A38 to get to M1 junction 28 interchange and travel north: At A38 Watchorn roundabout join the A61 towards Chesterfield. At Chesterfield, traffic directed onto the A617 eastbound towards the M1. At M1 junction 29 diversion ends

Diversion route for traffic using A38 to get to M1 junction 28 interchange and/or to travel south: At A38 Watchorn roundabout join the A61 towards Chesterfield. At Chesterfield traffic directed onto the A617 eastbound towards the M1. At M1 junction 29 join M1 southbound to junction 28 where diversion ends.

Local community & non-motorway diversion route: Traffic affected by the Abbott Road and Birchwood Lane slip road closures are directed to use the B6019 eastbound through Alfreton. B6019 joins the M1 junction 28 interchange where diversion ends.

We’re carrying out survey work on the A42, from junction 14 to the A453 Finger Farm roundabout and the M1 junction 23a exit / entry slip roads.

The purpose of our work is to carry out surveys to upgrade the street lighting along the carriageway in the future.

The survey work is due to start on 06 September 2021 and is scheduled for completion by 23 September 2021. To minimise inconvenience and disruption to road users, we will work overnight from Monday to Saturday between 8pm and 6am.

To maintain a safe environment for our workforce and motorists, we will need to use a mixture of lane and full carriageway closures, this will include entry / exit slip roads and lane closures on the A453 roundabout.

Once completed, all road users will benefit from less unplanned maintenance visits, allowing the traffic to flow uninterrupted.

Diversions

When roads are closed, we will put in place fully signed diversion routes which have been agreed with the Local Authority.

Carriageway closure

A42 Northbound from junction 14 to M1 junction 23A

Exit A42 at Junction 14, turn left and proceed along the A453. Turn right onto the A453 and continue past the Airport to Finger Farm roundabout. End of diversion.

A42 Southbound from A453 Finger Farm roundabout

For the A42 southbound continue on the A453, past East Midlands Airport and turn left onto the A453. At the roundabout take third exit onto A42. End of diversion.

Slip Road Closures

M1 junction 23A Northbound exit slip

Continue on M1 and take exit slip at junction 24. Take first exit onto A453 and continue to A453 Finger Farm roundabout. End of diversion.

M1 junction 23A Northbound entry slip

Continue on A42 to A453 Finger Farm roundabout, take third exit slip on roundabout and join A453. Continue on A453 to M1 J24 interchange and take third exit on roundabout joining M1 North. End of diversion.

M1 junction 23A Southbound exit slip

Continue on M1 and take exit slip at junction 23. Take third exit on roundabout onto A512 and continue on A512 for approximately 7.5 miles. At A512/A511/A42 RBT take second exit onto A42. End of diversion.

M1 junction 23A Southbound entry slip

For M1 South, continue on A42 to Junction 13 and take the exit. Take second exit on the roundabout and join A511. Continue on A511 until M1 J22 interchange. Take third exit on roundabout and join M1 Southbound slip. End of diversion.

We're will be updating and installing signage so we can start using emergency diversion routes along the A14 and A45 corridor.

We'll work overnight, from 8pm and 6am Monday to Friday, from 8pm and 6am. To carry out the work safely, we'll close the entry sliproad from Brackmills onto the A45 westbound and the exit slip road to Queen Eleanor Interchange from the A45 Westbound with lane closures on the A45 westbound. During the day we will keep the carriageway open as usual.

We will do our very best to complete the work as quickly as possible, keeping disturbances and noise to a minimum.

Diversion routes

A45 Westbound entry slip from Brackmills - Traffic will be directed to join the A45 eastbound, exit at Barnes Meadow Interchange, re-join the A45 westbound from here and continue underneath the Brackmills junction where diversion ends.

 

A45 Westbound exit slip to Queen Eleanor Interchange - Traffic will be directed to continue along the A45 westbound to the junction with M1 junction 15. Continue all the way around the roundabout and re-join the A45 travelling eastbound, exiting at Queen Eleanor Interchange.

 

We're carrying out a series of resurfacing works along the A46. To minimise disruption as much as possible, we'll carry out this work in phases; phase one will take place in July between A46/M1 J 21a and A46 Hobby Horse roundabout

Works will be carried out overnight Monday to Friday 8pm and 6am and will use a combination of slip road closures, lane and carriageway closures as below:

A46 northbound - M1 J21a to A46/A50 Glenfield

12-14 July - A46 northbound total closure

A46 northbound – A50 to A5630 Anstey

15-16 July - A46 northbound total closure

A46 southbound – Wanlip exit slip

19-20 July - A46 southbound slip road closure and lane 1 carriageway closures

A46 southbound - A6 to A506

21-26 July - A46 southbound total closure

A46 southbound – B5380 Kirby Muxloe exit slip

27-29 July - A46 southbound slip road closure and A46 southbound total closure

The carriageway will remain open as usual during the day.

All diversion routes will be clearly signed

Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

Once completed, road users will benefit improved road safety and a smoother driving experience.

For up to date details of closures please check our travel updates page.

We’re carrying out a series of resurfacing works along sections of the A46 carriageway. To minimise disruption as much as possible, we’ll carry out these works in phases; phase three will take place in September and October 2021 between Hykeham roundabout and Carholme roundabout.

Works will be carried out weekdays, overnight (Monday to Friday) from 8pm to 6am and will use a combination of slip road closures, lane and carriageway closures as outlined below:

Whisby

A46 at Whisby roundabout
13-22 September
A46 northbound & southbound full road closure

Doddington

A46 at Doddington roundabout
23-24 September
A46 northbound full road closure

A46 at Doddington roundabout
27-28 September
A46 northbound (in part) & southbound full road closure

Skellingthorpe

A46 at Skellingthorpe roundabout
29-30 September
A46 northbound full road closure

A46 at Skellingthorpe roundabout
01-04 October
A46 southbound full road closure

A46 between Doddington roundabout and Skellingthorpe roundabout
05-08 October
A46 southbound & northbound full road closure

Carholme

A46 at Carholme roundabout
11-12 October
A46 northbound full road closure

A46 at Carholme roundabout
13-14 October
A46 southbound full road closure

The carriageway will remain open as usual during the daytime. Once completed, road users will benefit improved road safety and a smoother driving experience.

All diversion routes will be clearly signed.

Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

For up to date details of closures please check our travel updates page.

We’ll be undertaking works to improve the standard of the connection of the B6166 Farndon Road to the A46 Farndon Roundabout, by:

• resurfacing the affected length of the road,
• providing new road drainage,
• upgrading the footways and cycleways
• installing updated traffic signs and street lighting

Initially, traffic flows on B6166 Farndon Road will be maintained in both directions during the day by utilising traffic management during October 2021. The current 30mph speed limit will remain in place.

Our main works will require full road closures of the B6166 Farndon Road. There will be overnight closures commencing Monday 4 October to Thursday 28 October and during November 2021, January and February 2022. The B6166 Farndon Road will remain closed between Sunday and Thursday nights, from 8pm to 5am.

• There will be a partial weekend closure commencing from Saturday 9 October to Monday 11 October 2021 and again in January, February and March 2022. The road closure will commence at 6pm Saturday evening until 5am Monday morning.

• We’ll also conduct a three-week full road closure between 1 November 2021 and 21 November 2021.

We’ll place clearly signed diversion routes during the closures at the following locations below:

A46 Farndon Roundabout
A46 Newark Northern Bypass
A46 Cattle Market Roundabout
B6326 Great North Road
B6166 Castle Gate
B6166 Lombard Street
B6166 Portland Street
B6166 Victoria Street
B6166 Farndon Road

We’ll be carrying out vegetation clearance works to the southbound exit slip road of the A46 Ratcliffe on the Wreake junction. This work will include trimming back and removal of some trees and other vegetation on the embankment, as well as planting new trees and shrubs in other areas.

This work is being carried out in preparation for a future scheme, where the embankment will be reinforced. The future scheme is planned to be carried out in mid-2022.

To keep disruption to a minimum, we’ll be working over a weekend. Our work is due to start at 8pm on Friday 10 December 2021 and is estimated to be completed by 6am on Monday 13 December 2021. Any noisy works will be carried out during the daytime, but temporary traffic management may be in place 24hrs a day.

Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

Diversion routes

To maintain a safe environment for our workforce and road users, we need to close the southbound exit slip road, and one lane of the A46 southbound carriageway. During these closures, we will put in place a fully signed diversion route, which has been agreed with the Local Authority.

We'll be making some improvements to the road surface. To minimise disruption as much as possible, works will take place overnight, from 27 September 2021 until end of January 2022. We will work Monday to Sunday, between the hours of 9pm and 6am.

Full closures in both directions northbound and southbound working one direction only at any given time. Outside of these hours the road will remain open as normal.

We will do our very best to complete the work as quickly as possible, keeping disturbances and noise to a minimum. Please note that all our planned roadworks may be subject to change due to weather conditions or unforeseen circumstances.

For up to date details of closures please check our travel updates page.

Diversion Routes

Clearly signed diversion routes, agreed with the Local Authority, will be in place during any closures and we advise drivers to stick to speed limits and follow appropriate signage to ensure your safety, the safety of those working on site and fellow road users.

  • For the M6 NB M1 J19 to M6 J1 the diversion route will be from the M1 and A14 Junction 19 to M1 northbound to Junction 20 to A4303 westbound to Roundabout at Junction with A4303 and A5 to A5 southbound to A5 Gibbet Roundabout to A426 westbound to M6 Junction 1
  • For the M6 SB Junction 1 to M1 Junction 19 the diversion route will be from the M6 Junction 1 to A426 eastbound to A5 Gibbet Roundabout to A5 northbound to A4303 eastbound to M1 Junction 20 to M1 southbound to M1 Junction 19 and A14

We'll be carrying out road improvement work to extend the life of the road by around 5 years. We'll also be refreshing the road markings, reinstating affected traffic detection loops and reinstating affected bridge expansion joints.

To minimise disruption as much as we can, the work will take place overnight from Monday to Friday between 10pm and 6am from 18 October 2021 until mid January 2022. We’ll confirm the date in January as soon as we can.

During these times there will be full closures of the northbound carriageway from junction 23 to junction 23A. We’re aiming to have the hard shoulder running at certain times during the closures and we’ll confirm when this will be.

The A42 northbound slip road at junction 23A will be closed, alongside the slip road leading from the A42 northbound to Finger Farm roundabout whilst we carry out these improvements.

Outside of these hours the roads will remain open as normal.

Diversion Routes

Clearly signed diversion routes will be in place during any closures. It’s important all drivers stick to the speed limits and follow appropriate signage to help keep everybody using the road safe.

For M1 northbound main carriageway closure:
M1 northbound traffic will leave the M1 at junction 23 and follow the A512 to the A42 and then re-join M1 northbound at M1 junction 23A.

For the A42 northbound on-slip closure:
A42 northbound traffic will leave the A42 at the A453 junction and follow the A453 through to Finger Farm roundabout (A453 northbound) and then re-join the M1 northbound at junction 24.

For closure of the slip road leading from the A42 northbound to Finger Farm roundabout:
Traffic will follow the A42 northbound to M1 Junction 23A, come off the M1 at junction 24, then use the A453 southbound through to Finger Farm roundabout.

Documents

Traffic information

Information about scheduled roadworks and events on our motorways and major roads.

Sign up for emails!

Sign up for details of roadworks in this region.

Feedback